INSTALLATION
Removal / installation · Vehicles built Aug 2012 – Jul 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. INSTALL DIESEL THROTTLE BODY ASSEMBLY |
![]() ![]() |
Install a new gasket and the throttle body with the 2 bolts and 2 nuts.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Connect the 2 connectors.

| 2. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY (w/o Intercooler) |
![]() ![]() |
Connect the pipe (with the 2 air hoses) and install the bolt.
- Torque:
- 20 N*m{ 204 kgf*cm , 15 ft.*lbf }
Tighten the 2 clamps.
Connect the vacuum hose to the gas filter.
Connect the manifold absolute pressure sensor connector.
| 3. INSTALL INTERCOOLER ASSEMBLY |


