INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1.
INSTALL EGR VALVE ASSEMBLY |
 |
Install a new gasket and the EGR valve.
| 2.
INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY |
 |
- Install 2 new gaskets and the pipe with the 2 nuts and 2 bolts.
-
Torque:
- 13 N*m{
133 kgf*cm
, 10 ft.*lbf
}
- HINT:
- The gasket's claws should be on the pipe side.
| 3.
INSTALL INTAKE AIR CONNECTOR |
 |
- Install a new gasket and the air connector with the 2 nuts and bolt.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
| 4.
INSTALL THROTTLE BODY BRACKET |
 |
Install the bracket with the 3 bolts.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
| 5.
INSTALL DIESEL THROTTLE BODY ASSEMBLY
|
 |
Install a new gasket and the throttle body with the 2 bolts and 2 nuts.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
- Connect the 2 connectors.
| 6.
INSTALL VACUUM SWITCHING VALVE BRACKET |
 |
- Install the bracket with the 2 bolts.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
Connect the vacuum hoses to the 2 locations.
Connect the 2 connectors.
| 7.
INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY
|
 |
Connect the pipe (with the 2 air hoses) and install the bolt.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
Tighten the 2 clamps.
Connect the vacuum hose to the gas filter.
Connect the manifold absolute pressure sensor connector.
| 8.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 9.
PERFORM INITIALIZATION |
 |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.