2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL EGR VALVE ASSEMBLY
  1. Install a new gasket and the EGR valve.


2. INSTALL NO. 1 EGR PIPE SUB-ASSEMBLY

  1. G037199E02
    Install 2 new gaskets and the pipe with the 2 nuts and 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }

    HINT:
    The gasket's claws should be on the pipe side.


3. INSTALL INTAKE AIR CONNECTOR

  1. A099620E01
    Install a new gasket and the air connector with the 2 nuts and bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }


4. INSTALL THROTTLE BODY BRACKET
  1. Install the bracket with the 3 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }


5. INSTALL DIESEL THROTTLE BODY ASSEMBLY

A111832
  1. Install a new gasket and the throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. A111790
    Connect the 2 connectors.


6. INSTALL VACUUM SWITCHING VALVE BRACKET

  1. A114169
    Install the bracket with the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the vacuum hoses to the 2 locations.

  1. Connect the 2 connectors.


7. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY

A111789
  1. Connect the pipe (with the 2 air hoses) and install the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 clamps.

  1. Connect the vacuum hose to the gas filter.

  1. Connect the manifold absolute pressure sensor connector.


8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

9. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

← INSPECTION (from Aug 2012)INSTALLATION (Aug 2012 – Jul 2013) →