INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. INSTALL VACUUM SWITCHING VALVE (for EVAP) |
Install the VSV with the bolt.

- Torque:
- 9.0 N*m{ 92 kgf*cm , 80 in.*lbf }
Connect the 2 hoses to the VSV.
| 2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 3. PERFORM INITIALIZATION |
Perform initialization (Click here).
- CAUTION:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
