2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL VACUUM SWITCHING VALVE (for EVAP)

  1. A112077
    Install the VSV with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 2 hoses to the VSV.


2. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

3. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    CAUTION:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

← INSPECTION (from Jun 2011)INSTALLATION (Aug 2012 – Jul 2013) →