2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built from Aug 2013

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL AIR SWITCHING VALVE ASSEMBLY

  1. A099545E01
    Install the valve with 2 new nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the connector.


2. INSTALL INTAKE PIPE INSULATOR

  1. A099544E01
    Install 2 new gaskets and the pipe with 4 new nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Check that the nuts are tightened to the torque specification.

    NOTICE:
    Tightening the nuts only once is not enough to tighten them to the torque specification.


3. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

  1. A099543E01
    Install the heat insulator with the 5 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


4. CONNECT NO. 4 AIR HOSE

  1. A110290
    Connect the No. 4 hose to the switching valve.

  1. Secure the hose with the clamp.


5. INSTALL AIR CLEANER ASSEMBLY

  1. A099521E01
    Connect the air cleaner hose.

  1. Install the air cleaner with the 2 bolts.

    Torque:
    14 N*m{ 143 kgf*cm , 10 ft.*lbf }

  1. Tighten the hose clamp.

    Torque:
    4.0 N*m{ 41 kgf*cm , 35 in.*lbf }

  1. Connect the MAF meter connector.


6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

7. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    CAUTION:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.

← INSTALLATION (Aug 2012 – Jul 2013)COMPONENTS (from Jun 2011) →