INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1.
INSTALL AIR SWITCHING VALVE ASSEMBLY |
 |
- Install the valve with 2 new nuts.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
Connect the connector.
| 2.
INSTALL INTAKE PIPE INSULATOR |
 |
- Install 2 new gaskets and the pipe with 4 new nuts.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
Check that the nuts are tightened to the torque specification.
- NOTICE:
- Tightening the nuts only once is not enough to tighten them to the torque specification.
| 3.
INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR |
 |
- Install the heat insulator with the 5 bolts.
-
Torque:
- 12 N*m{
122 kgf*cm
, 9 ft.*lbf
}
| 4.
CONNECT NO. 4 AIR HOSE |
 |
- Connect the No. 4 hose to the switching valve.
Secure the hose with the clamp.
| 5.
INSTALL AIR CLEANER ASSEMBLY
|
 |
- Connect the air cleaner hose.
Install the air cleaner with the 2 bolts.
-
Torque:
- 14 N*m{
143 kgf*cm
, 10 ft.*lbf
}
Tighten the hose clamp.
-
Torque:
- 4.0 N*m{
41 kgf*cm
, 35 in.*lbf
}
Connect the MAF meter connector.
| 6.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 7.
PERFORM INITIALIZATION |
 |
Perform initialization (Click here).
- CAUTION:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.