Removal / installation · Vehicles built from Jun 2011
HINT:
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
1.
INSTALL NO. 1 ROOF DRIP SIDE FINISH MOULDING CLIP
NOTICE:
It is only necessary to perform this procedure when replacing a No. 1 roof drip side finish moulding clip with a new one.
If installing new No. 1 roof drip side finish moulding clips, remove the adhesive remaining where the No. 1 roof drip side finish moulding clips will be installed on the vehicle body and clean the vehicle body with a non-residue solvent.
HINT:
When installing the No. 1 roof drip side finish moulding clip, heat the vehicle body and No. 1 roof drip side finish moulding clip using a heat light.
Standard:
Item
Temperature
Vehicle Body
40 to 60°C (104 to 140°F)
No. 1 Roof Drip Side Finish Moulding Clip
20 to 30°C (68 to 86°F)
NOTICE:
Do not heat the vehicle body or No. 1 roof drip side finish moulding clip excessively.
Apply a 2.0 to 3.0 mm (0.0787 to 0.118 in.) bead of adhesive (3M DP-105 or equivalent) to new No. 1 roof drip side finish moulding clips.
HINT:
Adhesive strength (tensile strength): 13.7 MPa (140.0 kgf/cm2, 1991 psi) or more (when the temperature is 23°C (73°F))
Text in Illustration
*1
Adhesive
*a
2 to 3 mm Bead of Adhesive
Apply primer to the body where the No. 1 roof drip side finish moulding clip will be installed.
NOTICE:
Do not let the primer dry.
While using the position shown in the illustration as a reference, place the No. 1 roof drip side finish moulding clip onto the roof panel. Then position and install the No. 1 roof drip side finish moulding clip after lightly pressing it so that the adhesive adheres to the primer.
Text in Illustration
*A
for Single Cab
*B
for Double Cab
*C
for Extra Cab
Standard:
Area
Measurement (Reference Value)
A
40.7 mm (1.60 in.)
B
47.6 mm (1.87 in.)
C
40.7 mm (1.60 in.)
D
39.2 mm (1.54 in.)
E
40.7 mm (1.60 in.)
F
42.9 mm (1.69 in.)
NOTICE:
Install the roof drip side finish moulding when 40 minutes or more have elapsed after pressing and installing the No. 1 roof drip side finish moulding clips.
HINT:
Initial hardening time: 40 minutes
Complete hardening time: 48 hours
2.
INSTALL ROOF DRIP SIDE FINISH MOULDING LH
Attach the 2 clips to install the roof drip side finish moulding.