2014 Hilux · Service Manual ENGINE

REASSEMBLY

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 from Aug 2012

NOTICE:
  1. When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
  2. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.


1. INSTALL TURBO WATER HOSE UNION (w/ EGR Cooler)

NOTICE:
If coolant leaks from a turbo water hose union or a turbo water hose union is corroded, replace the turbo water hose union.

  1. Clean the cylinder block side hole and new turbo water hose union with non-residue solvent.

  1. A330616E01
    Apply adhesive onto the shaded area of a turbo water hose union as shown in the illustration.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    NOTICE:
    Install the turbo water hose union within 3 minutes after applying adhesive.

  1. Set the turbo water hose union and tap it until the edge of the turbo water hose union fits against the chamfered part of the cylinder block as shown in the illustration.


2. INSTALL CYLINDER BLOCK WATER DRAIN COCK PLUG (w/o EGR Cooler)
  1. Clean the cylinder block side hole and new cylinder block water drain plug with non-residue solvent.

  1. A330617E01
    Apply adhesive onto the shaded area of a cylinder block water drain plug as shown in the illustration.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    NOTICE:
    Install the cylinder block water drain plug within 3 minutes after applying adhesive.

  1. Set the cylinder block water drain plug and tap it until the edge of the cylinder block water drain plug fits against the chamfered part of the cylinder block as shown in the illustration.


3. INSTALL TIGHT PLUG

A058129E03
  1. Apply adhesive to the end of a new tight plug.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    NOTICE:
    Do not start the engine for 1 hour after the installation.

  1. Position A:
    Using a 14 mm steel bar and hammer, tap in the tight plug as shown in the illustration.

  1. Other Positions:
    Using SST and a hammer, tap in a new tight plug as shown in the illustration.
    Position B

    SST
    09950-60010   (09951-00180)
    09950-70010   (09951-07100)
    Position C
    SST
    09950-60010   (09951-00190)
    09950-70010   (09951-07100)
    Position D
    SST
    09950-60010   (09951-00200)
    09950-70010   (09951-07100)
    Position E
    SST
    09950-60010   (09951-00350)
    09950-70010   (09951-07100)
    Position F
    SST
    09950-60010   (09951-00400, 09951-00450)
    09950-70010   (09951-07100)
    Position G
    SST
    09950-60010   (09951-00450)
    09950-70010   (09951-07100)

    A152216E01


4. INSTALL STUD BOLT

A226181E01

5. INSTALL STRAIGHT PIN

A152218E01

6. INSTALL RING PIN

A152219E01

7. INSTALL NO. 1 STRAIGHT SCREW PLUG
  1. Install a new gasket and the screw plug.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }


8. INSTALL NO. 1 OIL NOZZLE SUB-ASSEMBLY

A060268E01
  1. Align the pin of the oil nozzle with the pin hole of the cylinder block.

  1. Install the 4 oil nozzles together with the check valves.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }


9. INSTALL PISTON PIN

A060203E01

  1. Assemble the piston and connecting rod.

    1. Using a small screwdriver, install a new snap ring on one side of the piston pin hole.

    2. A060230E01
      Gradually heat the piston to about 60°C (140°F).

    3. A149784E01
      Coat the piston pin with engine oil.

    4. Align the front marks of the piston and connecting rod, and push in the piston pin with your thumb.

    5. A060232E01
      Check the fit between the piston and piston pin. Try to move the piston back and forth on the piston pin.

    6. A149754
      Using a small screwdriver, install a new snap ring on the other side of the piston pin hole.

  1. A154173E01
    Install the piston rings.

    1. Install the coil and oil ring by hand.

      HINT:
      Face the end gap of the oil ring in the opposite direction of the coil joint.

    2. A149788E01
      Using a piston ring expander, install the No. 1 and No. 2 piston rings with the code mark facing upward.

      Code mark:
      Number
      Mark
      No. 1
      w/o EGR system
      NP
      w/o EGR cooler
      1N or N1
      w/ EGR Cooler
      1VN
      No. 2
      N2

    3. Position the piston rings so that the ring ends are as shown.

      A149790E01

      NOTICE:
      Do not align the ring ends.


10. INSTALL CONNECTING ROD BEARING

A060205E01
  1. Align the bearing claw with the groove of the connecting rod or connecting cap.

  1. Install the bearings to the connecting rod and connecting rod cap.


11. INSTALL CRANKSHAFT BEARING

A060228E01

HINT:
Upper bearings have an oil groove and oil hole. Lower bearings do not.

  1. Align the bearing claw with the claw groove of the cylinder block, and push in the 5 upper bearings.

  1. A060190E01
    Align the bearing claw with the claw groove of the crankshaft bearing cap, and push in the 5 lower bearings.


12. INSTALL CRANKSHAFT

A060188E02
  1. Place the crankshaft on the cylinder block.

  1. Install the 2 upper thrust washers to the No. 5 journal position of the cylinder block.

    1. Push the crankshaft toward the front (rear) side.

    2. Install the 2 thrust washers with the oil grooves facing outward.

  1. A060189E03
    Install the 2 thrust washers on the No. 5 bearing cap with the grooves facing outward.

  1. A060226E01
    Install the 5 crankshaft bearing caps in their proper locations.

  1. A060270E07
    Install the crankshaft bearing cap bolts.

    HINT:
    1. The main bearing cap bolts are tightened in 2 progressive steps.
    2. If a main bearing cap bolt is broken or deformed, replace it.


    1. Apply a light coat of engine oil to the threads and under the bolt heads of the main bearing caps.

    2. Install and uniformly tighten the 10 bolts of the main bearing caps in several passes in the sequence shown in the illustration.

      Torque:
      50 N*m{ 510 kgf*cm , 37 ft.*lbf }

      If any one of the bearing cap bolts does not meet the torque specification, replace the bearing cap bolt.

    3. A060271E07
      Mark the front of the main bearing cap bolts with paint.

    4. Retighten the main bearing cap bolts 90° in the numerical order shown on previous page.

    5. Check that the painted marks are now at a 90° angle to the front.

  1. Check that the crankshaft turns smoothly.

  1. Check the crankshaft thrust clearance.


13. INSTALL PISTON AND CONNECTING ROD

  1. A149792E01
    Using a piston ring compressor, push the correctly numbered piston and connecting rod assembly into the cylinder with the front mark of the piston facing forward.

  1. A060237E01
    Place the connecting rod cap on the connecting rod.

    1. Match the numbered connecting rod cap with the connecting rod.

    2. Align the pins of the connecting rod cap with the pin holes of the connecting rod, and install the connecting rod cap.

    3. A060238E01
      Check that the front mark of the connecting rod cap is facing forward.

  1. A060235E01
    Install the connecting rod cap bolts.

    HINT:
    1. The connecting rod cap bolts are tightened in 2 progressive steps.
    2. If any connecting rod bolt is broken or deformed, replace it.


    1. Apply a light of engine oil on the threads and under the heads of the connecting rod cap bolts.

    2. Install and alternately tighten the bolts of the connecting rod cap in several passes.

      Torque:
      35 N*m{ 357 kgf*cm , 26 ft.*lbf }

      If any one of the connecting rod cap bolts does not meet the torque specification, replace the cap bolts.

    3. A060197E02
      Mark the front of the connecting rod cap bolts with paint.

    4. Retighten the connecting rod cap bolts 90° as shown.

    5. Check that the painted marks are now at a 90° angle to the front.

  1. Check that the crankshaft turns smoothly.

  1. Check the connecting rod thrust clearance (Click here).


14. INSTALL CYLINDER BLOCK OIL ORIFICE

15. INSTALL ENGINE REAR OIL SEAL RETAINER

A156389E01
  1. Remove oil seal packing (FIPG) from oil pan and cylinder block.

  1. Apply seal packing to the specific places described in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    3 to 5 mm (0.12 to 0.20 in.)

    NOTICE:
    After applying FIPG, install the engine rear oil seal retainer within 3 minutes and tighten its bolts within 15 minutes.

  1. A156390
    Install the retainer with the 5 bolts. Alternately tighten the 5 bolts in several passes.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


16. INSTALL TIMING GEAR CASE ASSEMBLY
  1. Remove any old packing (FIPG) material.

  1. A075511E02
    Apply seal packing to the timing gear case as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    5 mm (0.20 in.)

    NOTICE:
    Install the timing gear case assembly within 3 minutes and tighten its bolts within 15 minutes as soon as applying FIPG is completed.

  1. A060151E01
    Install a new gasket to the groove of the timing gear case.

  1. A060152E01
    Install 2 new O-rings to the cylinder block groove of the timing gear case.

  1. Align the mark on the oil pump drive gear with the mark on the timing gear case.

  1. A060280E01
    Install the timing gear case with the union bolt and 8 bolts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf } for union bolt (A)
    13 N*m{ 133 kgf*cm , 10 ft.*lbf } for bolt

  1. A060154E01
    Remove the screw plug.

  1. Pour in approximately 20 cc (0.12 cu in.) of engine oil into the oil pump.

  1. Install a new gasket and the screw plug.

    Torque:
    44 N*m{ 449 kgf*cm , 32 ft.*lbf }


17. INSTALL OIL STRAINER SUB-ASSEMBLY
  1. Install a new gasket and the oil strainer with the 2 bolts and 2 nuts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


18. INSTALL OIL PAN SUB-ASSEMBLY

A151187E01
  1. Remove any old packing (FIPG) material.

  1. Apply seal packing to the oil pan as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    4 mm (0.16 in.)

    NOTICE:
    Install the oil pan assembly within 3 minutes and tighten its bolts within 15 minutes as soon as applying FIPG is completed.

  1. Install the oil pan with the 22 bolts and 2 nuts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Install the oil level gauge sensor with the 4 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


19. INSTALL CRANKSHAFT TIMING GEAR

A061827E01
  1. Position the crankshaft timing gear with timing mark 1 facing forward.

  1. Align the key groove of the crankshaft timing gear with the set key on the crankshaft.

  1. Using SST and a hammer, tap on the timing gear to install it.

    SST
    09223-00010  


20. INSTALL INJECTION GEAR
  1. Install a new O-ring and the supply pump with the 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

  1. Temporarily install the injection gear with the nut.

    HINT:
    Fit the key (protrusion) of the supply pump in the key slot of the injection gear.

  1. A222336E01
    Install a new O-ring to the injection gear.

  1. A222618E01
    Install the the injection gear set nut.

  1. Using SST, tighten the nut.

    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    64 N*m{ 650 kgf*cm , 47 ft.*lbf }


21. INSTALL NO. 2 IDLE SUB GEAR

A060166E01
  1. Using a cloth or equivalent, mount the No. 1 idle gear in a vise as shown in the illustration.

    NOTICE:
    Be careful not to damage the gear.

  1. A060167E01
    Install the gear spring.

  1. Install the No. 2 idle sub gear.

    HINT:
    Align the pins on the gears with the spring ends.

  1. Install the wave washer.

  1. A060165E01
    Using snap ring pliers, install the snap ring.

  1. A060164
    Using SST, align the holes of the No. 1 idle gear and No. 2 idle sub gear by turning the No. 2 idle sub gear clockwise, and temporarily install a service bolt.
    SST
    09960-10010   (09962-01000, 09963-00700)

    Recommended Service Bolt:
    Thread diameter
    Thread pitch
    Bolt length
    6.0 mm (0.23 in.)
    1.0 mm (0.03 in.)
    Approx. 19 mm (0.75 in.)

  1. Align the gear teeth of the No. 1 idle gear and No. 2 idle sub gear, and tighten the service bolt.


22. INSTALL NO. 1 IDLE GEAR SHAFT

  1. A060159E05
    Install the gear shaft as shown in the illustration


23. INSTALL NO. 1 IDLE GEAR

  1. G036757E01
    Align the "5" timing marks of the idle gear and crankshaft timing gear.

  1. Using SST, turn the injection and align the "4" timing marks of the idle gear and injection gear, and then mesh the gears.

    SST
    09960-10010   (09962-01000, 09963-00700)

  1. A222334E01
    Position the thrust plate with the protrusion facing forward.

  1. Align the bolt holes and install the thrust plate with the 2 bolts.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }

  1. Remove the service bolt.


24. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE
  1. Align the key groove of the sensor plate with the set key.

  1. Install the sensor plate with the cupped side facing outward.


25. INSTALL TIMING GEAR COVER
  1. Remove any old seal packing (FIPG material).

  1. A059934E01
    Apply seal packing to the timing gear cover as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    3 to 5 mm (0.12 to 0.20 in.)

    NOTICE:
    After applying seal packing, install the timing gear cover within 3 minutes and tighten the bolts within 15 minutes.

  1. A060162E01
    Install a new O-ring to the timing gear case.

  1. A060274E01
    Install the timing gear cover with the 14 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


26. INSTALL WATER PUMP ASSEMBLY

A225339
  1. Install a new gasket and the water pump with the 5 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }


27. INSTALL CYLINDER HEAD GASKET

A060285E01
  1. Find where the piston head protrudes most by slowly turning the crankshaft clockwise and counterclockwise.

  1. A058134E01
    Measure the piston protrusion of each cylinder at 2 points as shown in the illustration.

  1. For the piston protrusion value of each cylinder, use the average of the 2 measurements of each cylinder.

    Piston protrusion:
    0.005 to 0.255 mm (0.0002 to 0.0100 in.)

    HINT:
    When the removing piston and connecting rod assembly: If the protrusion is not as specified, remove the piston and connecting rod assembly and reinstall them.

  1. A060174E01
    Select a new cylinder head gasket.

    HINT:
    New cylinder head gaskets are available in 5 sizes, and are marked A, B, C, D or E.

    New installed cylinder head gasket thickness:
    Mark
    Thickness
    A
    0.80 to 0.90 mm (0.0315 to 0.0354 in.)
    B
    0.85 to 0.95 mm (0.0335 to 0.0374 in.)
    C
    0.90 to 1.00 mm (0.0354 to 0.0394 in.)
    D
    0.95 to 1.05 mm (0.0374 to 0.0413 in.)
    E
    1.00 to 1.10 mm (0.0394 to 0.0433 in.)


    1. Select the largest piston protrusion value from the measurements made. Then select a new appropriate gasket according to the table below.

      Use gasket size:
      Gasket Size
      Piston Protrusion
      Use A
      0.005 to 0.054 mm (0.0002 to 0.0021 in.)
      Use B
      0.055 to 0.104 mm (0.0022 to 0.0041 in.)
      Use C
      0.105 to 0.154 mm (0.0041 to 0.0061 in.)
      Use D
      0.155 to 0.204 mm (0.0061 to 0.0080 in.)
      Use E
      0.205 to 0.255 mm (0.0081 to 0.0100 in.)

  1. A060144E01
    Place the cylinder head on the cylinder block.

    1. Place the cylinder head gasket on the cylinder block.

      NOTICE:
      Be careful of the installation direction.

    2. Place the cylinder head on the cylinder head gasket.


28. INSTALL CYLINDER HEAD SUB-ASSEMBLY

A060284E01

HINT:
  1. The cylinder head bolts are tightened in 3 progressive steps.
  2. If any bolt is broken or deformed, replace it.

  1. Apply a light coat of engine oil on the threads and under the heads of the cylinder head bolts.

  1. Install and uniformly tighten the 18 cylinder head bolts, in several passes in the sequence shown in the illustration.

    Torque:
    85 N*m{ 867 kgf*cm , 63 ft.*lbf }

    Bolt length A:
    110 mm (4.33 in.)

    Bolt length B:
    167 mm (6.57 in.)

    If any of the cylinder head bolts does not meet the torque specification, replace it.

  1. A060141E02
    Mark the front of the cylinder head bolts with paint.

  1. Further tighten the cylinder head bolts by 90° in the sequence shown in the illustration above.

  1. Finally, tighten the cylinder head bolts by an additional 90°.

  1. Check that the painted marks are now facing rearward.


29. INSTALL CAMSHAFT

G036616E01
  1. Using the crankshaft pulley bolt, set the No. 1 cylinder to 90° BTDC/compression.

    HINT:
    Set the No. 1 cylinder to 90° BTDC/compression to avoid interference with the piston top and valve head.

  1. A060149E02
    Install the camshaft.

    1. Apply MP grease to the thrust portion of the camshaft.

    2. Place the camshaft on the cylinder head, facing the key groove upward.

    3. A060150E01
      Align the timing marks (1 dot mark) of the camshaft drive and driven main gears, and set the No. 2 camshaft in place.

  1. A060283E03
    Remove any old packing (FIPG) material from the camshaft bearing cap.

  1. Apply seal packing to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    4 mm (0.16 in.)

    NOTICE:
    1. Do not allow FIPG to contact the oil passage of the bearing cap.
    2. After applying FIPG, install the camshaft bearing caps within 3 minutes and fasten the bolts within 15 minutes.
    3. Do not start the engine for at least 2 hours after the installation.


    1. A060146E01
      Install the 5 bearing caps in their proper locations.

    2. A060147E02
      Apply a light coat of engine oil on the threads and under the heads of the bearing cap bolts.

    3. Install and uniformly tighten the 15 bearing cap bolts in several passes in the sequence shown in the illustration.

      Torque:
      19 N*m{ 194 kgf*cm , 14 ft.*lbf }

  1. Install the camshaft oil seal.


30. INSPECT VALVE CLEARANCE

A060176E02
  1. Check only the valves indicated.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

      Standard valve clearance (Cold):
      Intake
      Exhaust
      0.20 to 0.30 mm (0.008 to 0.012 in.)
      0.35 to 0.45 mm (0.014 to 0.018 in.)

      Write down valve clearance measurements that are out of the specified range. These measurements will be used later to determine the size of the adjustment shim to be installed.

  1. Turn the crankshaft 360° to set the No. 4 cylinder to TDC / compression.

  1. A060175E02
    Check only the valves indicated.

    1. Using a feeler gauge, measure the clearance between the valve lifter and camshaft.

      Standard valve clearance:
      Intake
      Exhaust
      0.20 to 0.30 mm (0.008 to 0.012 in.)
      0.35 to 0.45 mm (0.014 to 0.018 in.)

      Write down valve clearance measurements that are out of the specified range. These measurements will be used later to determine the size of the adjustment shim to be installed.


31. ADJUST VALVE CLEARANCE
  1. Adjust the valve clearance (Click here).


32. INSTALL INJECTOR ASSEMBLY

NOTICE:
Be sure to install the injector, holder clamp, washer and bolt in their original positions.

  1. B008252E01
    Install 4 new injection nozzle seats to the cylinder head.

  1. Apply a small amount of clean engine oil to 4 new O-rings.

  1. G036760E06
    Install an O-ring to each injector as shown in the illustration.

  1. Insert the 4 injectors into the cylinder head.

    NOTICE:
    1. Insert the injector until it touches the nozzle sheet surface.
    2. After installing the injector to the cylinder head, the O-ring may prevent the injector from fully seating. If so, pull out the injector and reinstall it.
    3. Always return an injector to the same place it was removed from.

  1. For an injector that has been replaced with a new injector, register the injector compensation code (Click here).

  1. A060177E04
    Temporarily install 4 new washers and the 4 nozzle holder clamps with the 4 bolts.

    NOTICE:
    Make sure that the washers face the direction shown in the illustration.

    HINT:
    Apply a small amount of clean engine oil to the threads and under the heads of the clamp bolts.

    NOTICE:

    1. G037744E04
      The fork portion of the nozzle holder clamp must be set to the injector.
    2. Before tightening the bolts, check that the nozzle holder clamp is set properly.
    3. To fasten the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque in the following step.
    4. When tightening the bolts, pay attention not to tilt the bolt and clamp.
    5. Do not reuse the washer.
    6. If the nozzle leakage pipe is accidentally tightened beyond the torque specification, it must be replaced.

  1. Temporarily install the 4 injection pipes with the union nuts.

    HINT:
    To position the injectors, loosely tighten the union nut.

  1. A062123E01
    Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
    If scratches or dents are present, replace the nozzle leakage pipe.

  1. A070538E03
    Set the leakage pipe and 5 new gaskets in place.

  1. Apply a small amount of oil to the 4 hollow screws and union bolt.

  1. Temporarily install the leakage pipe with the 4 hollow screws and union bolt.

  1. Tighten the 4 holder clamp bolts.

    Torque:
    22 N*m{ 220 kgf*cm , 16 ft.*lbf }

  1. A051297E06
    Tighten the 4 hollow screws in order from 1 to 4.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    NOTICE:
    If an hollow screw is accidentally tightened beyond the torque specification, it must be replaced.

  1. Tighten the union bolt.

    Torque:
    13 N*m{ 127 kgf*cm , 9 ft.*lbf }

    NOTICE:
    If the union bolt is accidentally tightened beyond the torque specification, it must be replaced.

  1. Remove the 4 injection pipes.


33. CHECK FOR FUEL LEAKS

  1. A154541E03
    Check that there are no leaks from the nozzle leakage pipe connection.

    1. Install the gasket and No. 2 nozzle leakage pipe to the cylinder head with SST (check valve).

      Part No.:
      23762-27010 (No. 2 nozzle leakage pipe)

      SST
      09280-00010  

      Torque:
      21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    2. Apply a small amount of soapy water (or other fluid for detecting fuel leakage) on the nozzle leakage pipe connection.

    3. A154542E01
      Install SST (turbocharger pressure gauge) to the fuel return side of the leakage pipe, and maintain 100 kPa (1.0 kgf/cm2, 14.5 psi) of pressure for 60 seconds to check that no bubbles form.
      SST
      09992-00242  

      NOTICE:
      Before checking the leakage, be sure to remove the ball and spring in the check valve.

    4. After checking for fuel leaks, wipe off the soapy water from the leakage pipe connection.

    5. Remove SST, No. 2 nozzle leakage pipe and gasket.

      NOTICE:
      Never reinstall the disassembled union bolt on the engine.


34. INSTALL CYLINDER BLOCK INSULATOR (w/ EGR Cooler)

  1. A149941
    Install the block insulator to the head.


35. INSTALL NO. 2 TIMING BELT COVER

A060279E01
  1. Apply seal packing (FIPG) to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    After applying FIPG, install the No. 2 timing belt cover within 3 minutes and tighten its bolts and nut within 15 minutes.

  1. Install the No. 2 timing belt cover with the 4 bolts and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }


36. INSTALL CAMSHAFT TIMING PULLEY

A060182E01
  1. Install the camshaft timing pulley.

  1. Fasten the bolt of the camshaft timing pulley by holding the camshaft with a wrench.

    Torque:
    98 N*m{ 1000 kgf*cm , 72 ft.*lbf }


37. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

  1. A272954E01
    Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover in the directions shown in the illustration.

    NOTICE:
    1. Do not install the No. 3 cylinder head cover gaskets at an angle.
    2. Check that there is no foreign matter at the installation location of the No. 3 cylinder head cover gaskets.

  1. Remove any old seal packing (FIPG) material from the cylinder head.

  1. A060179E02
    Apply seal packing to the specific areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the belt cover within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing the seal packing.

  1. G034877E01
    Install the gasket and cylinder head cover with the 10 bolts and 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }


38. INSTALL NOZZLE HOLDER SEAL
  1. Install 4 new nozzle holder seals.


39. INSTALL OIL FILLER CAP SUB-ASSEMBLY
← REPLACEMENT (from Jun 2011)REASSEMBLY (from Aug 2012) →