2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Aug 2012 – Jul 2013

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for EVAP)

A113417
  1. Install the switching valve with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Connect the 2 hoses.

  1. Connect the connector.


2. INSTALL V-BANK COVER
  1. Install the cover with the 2 nuts.

    Torque:
    7.5 N*m{ 76.5 kgf*cm , 66 in.*lbf }


3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

4. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.