INSTALLATION
Removal / installation · Vehicles built Aug 2012 – Jul 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. INSTALL VACUUM SWITCHING VALVE ASSEMBLY (for EVAP) |
![]() ![]() |
Install the switching valve with the bolt.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Connect the 2 hoses.
Connect the connector.
| 2. INSTALL V-BANK COVER |
Install the cover with the 2 nuts.
- Torque:
- 7.5 N*m{ 76.5 kgf*cm , 66 in.*lbf }
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 4. PERFORM INITIALIZATION |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.


