INSTALLATION
Removal / installation · Vehicles built Aug 2012 – Jul 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1.
INSTALL VENTILATION VALVE SUB-ASSEMBLY |
 |
Apply adhesive to 2 or 3 threads of the valve.
- Adhesive:
- Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
- Install the valve.
-
Torque:
- 5.0 N*m{
51 kgf*cm
, 44 in.*lbf
}
Connect the ventilation hose to the valve.
Secure the hose with the clamp.
| 2.
INSTALL INTAKE AIR SURGE TANK
|
 |
Install a new gasket and the surge tank with the 2 nuts.
-
Torque:
- 28 N*m{
286 kgf*cm
, 21 ft.*lbf
}
Using an 8 hexagon wrench, install the 4 bolts.
-
Torque:
- 28 N*m{
286 kgf*cm
, 21 ft.*lbf
}
- Install the 3 upper bolts which are used to secure the 2 surge tank stays and throttle body bracket.
-
Torque:
- 21 N*m{
214 kgf*cm
, 16 ft.*lbf
}
- Install the 3 wire harness clamps and hose clamp.
Connect the throttle motor connector.
Connect the 2 VSV connectors.
- Connect the ventilation hose.
- Connect the vapor feed hose assembly.
- Connect the No. 4 water by-pass hose.
- Connect the No. 5 water by-pass hose.
| 3.
INSTALL V-BANK COVER |
 |
Install the cover with the 2 nuts.
-
Torque:
- 7.5 N*m{
76.5 kgf*cm
, 66 in.*lbf
}
| 4.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 5.
PERFORM INITIALIZATION |
 |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.