REMOVAL
Removal / installation · Vehicles built Aug 2012 – Jul 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
- HINT:
- Use the same procedures for the RH and LH sides.
- The procedures listed below are for the LH side.
- Use the same procedures for the RH and LH sides.
| 1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL |
- CAUTION:
- Wait at least 90 seconds after disconnecting the cable from the negative (-) battery terminal to prevent airbag and seat belt pretensioner activation.
| 2. REMOVE INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY CENTER |
for Manual Air Conditioning System:
Put protective tape around the center instrument cluster finish panel.

Text in Illustration *1
Protective Tape
Using a moulding remover, detach the 10 claws and 4 clips.
Detach the 4 claws and disconnect the air conditioner control.

Disconnect the connectors and remove the center instrument cluster finish panel.
for Automatic Air Conditioning System:
Put protective tape around the center instrument cluster finish panel.

Text in Illustration *1
Protective Tape
Using a moulding remover, detach the 8 claws and 4 clips.
Disconnect the connectors and remove the center instrument cluster finish panel.
| 3. REMOVE HEATER CONTROL KNOB |
![]() ![]() |
Remove the heater control knob as shown in the illustration.
| 4. REMOVE FRE/REC CONTROL KNOB |
![]() ![]() |
Remove the No. 2 heater control knob as shown in the illustration.
| 5. REMOVE HAZARD WARNING SIGNAL SWITCH ASSEMBLY |
![]() ![]() |
Detach the 2 claws and remove the switch.



