INSTALLATION
Removal / installation · Vehicles built Jun 2011 – Jul 2012
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1.
INSTALL CHARGE AIR COOLER ASSEMBLY |
 |
- Install a new gasket and the intake air connector with the 4 bolts.
-
Torque:
- 10 N*m{
102 kgf*cm
, 7 ft.*lbf
}
- Using a 22 mm deep socket wrench, install a new gasket and the IAT sensor.
-
Torque:
- 29.4 N*m{
300 kgf*cm
, 22 ft.*lbf
}
- Install the CAC with the 4 bolts.
-
Torque:
- 32 N*m{
326 kgf*cm
, 24 ft.*lbf
}
for bolt A
-
Torque:
- 12 N*m{
122 kgf*cm
, 9 ft.*lbf
}
for bolt B
- Install a new No. 2 air hose and then tighten the 2 hose clamps.
-
Torque:
- 6.5 N*m{
66 kgf*cm
, 58 in.*lbf
}
- Tighten the 2 hose clamps of the No. 1 air hose.
-
Torque:
- 6.5 N*m{
66 kgf*cm
, 58 in.*lbf
}
Connect the diesel turbo IAT sensor connector.
| 2.
INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR |
 |
- Install the sensor with the bolt.
-
Torque:
- 6.0 N*m{
61 kgf*cm
, 53 in.*lbf
}
Connect the sensor connector.
| 3.
INSTALL NO. 1 GAS FILTER |
 |
- Install the gas filter with the bolt.
-
Torque:
- 6.0 N*m{
61 kgf*cm
, 53 in.*lbf
}
| 4.
INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY |
 |
- Install the cover with the 3 bolts and 2 nuts.
-
Torque:
- 7.0 N*m{
71 kgf*cm
, 62 in.*lbf
}
| 5.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 6.
PERFORM INITIALIZATION |
 |
Perform initialization (Click here).
- CAUTION:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.