INSTALLATION
Removal / installation · Vehicles built Aug 2012 – Jul 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1.
INSTALL VACUUM SWITCHING VALVE (for EGR CUT)
|
 |
Install the valve with the bolt.
-
Torque:
- 3.5 N*m{
36 kgf*cm
, 31 in.*lbf
}
| 2.
INSTALL VACUUM SWITCHING VALVE BRACKET
|
 |
- Install the bracket with the 2 bolts.
-
Torque:
- 20 N*m{
204 kgf*cm
, 15 ft.*lbf
}
Connect the vacuum hoses to the 3 locations.
Connect the 2 connectors.
| 3.
INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY
|
 |
- Install the cover with the 3 bolts and 2 nuts.
-
Torque:
- 7.0 N*m{
71 kgf*cm
, 62 in.*lbf
}
| 4.
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
|
| 5.
PERFORM INITIALIZATION |
 |
Perform initialization (Click here).
- CAUTION:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.