2014 Hilux · Service Manual HEATER & AIR CONDITIONING SYSTEM

INSTALLATION

Removal / installation · Vehicles built Jun 2011 – Jul 2012

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013

HINT:
  1. Use the same procedure for RHD and LHD vehicles.
  2. The procedure listed below is for LHD vehicles.


1. INSTALL HEATER SWITCH ASSEMBLY
  1. Attach the 2 claws to install the heater switch assembly.

  1. Connect the connector.


2. INSTALL SWITCH BASE
  1. Connect the connectors.

  1. Attach the 8 claws to install the switch base.


3. INSTALL LOWER INSTRUMENT PANEL FINISH PANEL SUB-ASSEMBLY
  1. Attach the 3 guides, 2 claws and 3 clips to install the lower instrument panel finish panel.


4. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

B278068E01
  1. Attach the 2 hinges to install the glove compartment door.

    Text in Illustration 
    *1
    Hinge

  1. B278069E01
    While pushing in the sides of the glove compartment door as indicated by the arrows in the illustration, close the door to engage it to the 2 stoppers.
    Text in Illustration 
    *1
    Stopper

← INSPECTION (from Jun 2011)INSTALLATION (Aug 2012 – Jul 2013) →