ON-VEHICLE INSPECTION
Inspection · Vehicles built from Jun 2011
| CHECK INJECTION PUMP |
Inspect the engine speed sensor.

Measure the resistance of the sensor.
- Standard resistance:
Tester Connection
Condition
Specified Condition
1 (NE-) - 2 (NE+)
20°C (68°F)
205 to 255 Ω
Inspect the spill control valve.

Measure the resistance of the spill control valve.
- Standard resistance:
Tester Connection
Condition
Specified Condition
1 (SPV-) - 2 (SPV+)
20°C (68°F)
1 to 2 Ω
| CHECK TIMING CONTROL VALVE |
Inspect the timing control valve.

Measure the resistance of the timing control valve.
- Standard resistance:
Tester Connection
Condition
Specified Condition
1 (+B) - 2 (TCV)
20°C (68°F)
10 to 14 Ω
Inspect the timing control valve operation.
Connect the battery's positive (+) lead to the timing control terminal +B.
Connect the battery's negative (-) lead to the timing control valve terminal TCV.
Check that the solenoid makes a "click" sound.
- NOTICE:
- Do not apply voltage for more than 30 seconds to avoid burning out the timing control valve solenoid.
- When performing this step, wait until the solenoid coils become cool enough that the solenoid can be touched by hand.
- Do not apply voltage for more than 30 seconds to avoid burning out the timing control valve solenoid.
