REASSEMBLY
Removal / installation · Vehicles built from Jun 2011
| 1.
INSTALL DELIVERY VALVE HOLDER |
 |
- Install new gaskets and the valves into the distributive head.
Install the springs into the delivery valve holders.
Using SST, install the delivery holders.
- SST
- 09260-54012
(09269-54020)
-
Torque:
- 59 N*m{
602 kgf*cm
, 43 ft.*lbf
}
| 2.
INSTALL DISTRIBUTIVE HEAD PLUG |
 |
- Install a new O-ring to the distributive head plug.
Using SST, install the head plug.
- SST
- 09260-54012
(09262-54010)
-
Torque:
- 88 N*m{
900 kgf*cm
, 65 ft.*lbf
}
| 3.
INSTALL FUEL TEMPERATURE SENSOR |
 |
- Install a new O-ring to the fuel temperature sensor.
Using a 19 mm deep socket wrench, install the fuel temperature sensor.
-
Torque:
- 22 N*m{
224 kgf*cm
, 16 ft.*lbf
}
| 4.
INSTALL TIMING CONTROL VALVE |
 |
- Using a 5 mm hexagon wrench, install the timing control valve with the 2 bolts.
| 5.
INSTALL FUEL FILTER TO INJECTION PUMP FUEL PIPE |
 |
- Install a new washer and the hollow screw.
-
Torque:
- 37 N*m{
375 kgf*cm
, 27 ft.*lbf
}
Install the fuel pipe with 2 new washers and the cap nut.
-
Torque:
- 27 N*m{
271 kgf*cm
, 20 ft.*lbf
}
| 6.
INSTALL NO. 4 NOZZLE LEAKAGE PIPE |
 |
Install the nozzle leakage pipe with 2 new washers and the overflow screw.
-
Torque:
- 27 N*m{
271 kgf*cm
, 20 ft.*lbf
}