INSTALLATION
Removal / installation · Vehicles built Aug 2012 – Jul 2013
Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013
| 1. INSTALL HEADLIGHT LEVELING SWITCH |
![]() ![]() |
Attach the 2 claws and install the headlight leveling switch.
| 2. INSTALL NO. 1 SWITCH HOLE BASE |
Attach the 5 claws to install the No. 1 switch hole base.
| 3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL |
| 4. PERFORM INITIALIZATION |
Perform initialization (Click here).
- NOTICE:
- Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.


