INSTALLATION
Removal / installation · Vehicles built from Aug 2012
| 1. INSTALL VACUUM SWITCHING VALVE (for EGR Cut) |
Install the vacuum switching valve to the manifold stay with the screw.
- Torque:
- 3.5 N*m{ 36 kgf*cm , 31 in.*lbf }
| 2. INSTALL VACUUM TRANSMITTING HOSE ASSEMBLY |
Install the vacuum transmitting hose shown in the illustration.

Text in Illustration *1
Yellow Paint
| 3. INSTALL NO. 2 VACUUM TRANSMITTING HOSE ASSEMBLY |
Install the No. 2 vacuum transmitting hose to the vacuum switching valve shown in the illustration.

Text in Illustration *1
Pink Paint
| 4. INSTALL MANIFOLD STAY WITH VACUUM SWITCHING VALVE |
Install the manifold stay with vacuum switching valve with the 2 bolts and connect the vacuum transmitting hose.

- Torque:
- 19 N*m{ 194 kgf*cm , 14 ft.*lbf }
- NOTICE:
- Be sure to securely connect the vacuum transmitting hose.
Connect the 2 vacuum transmitting hoses.

Text in Illustration *1
Yellow Paint
*2
Pink Paint
- NOTICE:
- Be sure to securely connect the vacuum transmitting hoses.
- Make sure the vacuum transmitting hoses' color matches the connection areas' color.
- Be sure to securely connect the vacuum transmitting hoses.
Connect the vacuum switching valve connector.
