2014 Hilux · Service Manual ENGINE

INSTALLATION

Removal / installation · Vehicles built Aug 2012 – Jul 2013

Versions by build date: Jun 2011 – Jul 2012 Aug 2012 – Jul 2013 from Aug 2013


1. INSTALL INJECTOR ASSEMBLY

NOTICE:
Be sure to install the injector, holder clamp, washer and bolt in their original positions.

  1. B008252E01
    Install 4 new injection nozzle sheets to the cylinder head.

  1. Apply a light amount of clean engine oil to 4 new O-rings.

  1. G036760E02
    Install the O-ring to each injector as shown in the illustration.

  1. Insert the 4 injectors into the cylinder head.

    NOTICE:
    1. At this time, insert the injector until it touches the nozzle sheet surface.
    2. After installing the injector to the cylinder head, the O-ring may prevent the injector from fully seating. If so, pull out the injector and reinstall it.
    3. Always return an injector to the same place it was removed from.

  1. Register injector compensation code (when replacing with a new injector).

  1. A060177E02
    Temporarily install 4 new washers and the 4 nozzle clamps with the 4 clamp bolts.

    HINT:
    Apply a light amount of engine oil to the threads and under the heads of the clamp bolts.

    NOTICE:

    1. G037744E01
    2. The fork portion of the nozzle holder clamp must be set to the injector.
    3. Before tightening the bolts, check that the nozzle holder clamp is set properly.
    4. To fasten the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque at the following step.
    5. When tightening the bolts, pay attention not to tilt the bolt and the clamp.
    6. Do not reuse the washer.
    7. If the nozzle leakage pipe is accidentally tightened beyond the torque specification, it must be replaced.

  1. Temporarily install the 4 injection pipes with the union nuts.

    HINT:
    To position the injectors, loosely tighten the union nut.

  1. A062123E01
    Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
    If scratches or dents are present, replace the nozzle leakage pipe.

  1. A070538E01
    Set the leakage pipe and 5 new gaskets in place.

    NOTICE:
    Apply a light amount of oil to the 4 hollow screws and union bolt.

  1. A060184E01
    Temporarily install the leakage pipe with the 4 hollow screws and union bolt.

  1. Tighten the 4 holder clamp bolts.

    Torque:
    22 N*m{ 224 kgf*cm , 16 ft.*lbf }

  1. A051297E01
    Tighten the 4 hollow screws in order from 1 to 4.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    NOTICE:
    If a hollow screw is accidentally tightened beyond the torque specification, it must be replaced.

  1. Tighten the union bolt.

    Torque:
    12.5 N*m{ 127 kgf*cm , 9 ft.*lbf }

    NOTICE:
    If the union bolt is accidentally tightened beyond the torque specification, it must be replaced.

  1. Remove the 4injection pipes and union nuts.


2. CHECK FOR FUEL LEAK

  1. A154541E01
    Check that there are no leaks from the nozzle leakage pipe connection.

    1. Install the gasket and No. 2 nozzle leakage pipe to the cylinder head with SST (check valve).

      SST
      09280-00010  

      Part No.:
      23762-27010 (No. 2 nozzle leakage pipe)

      Torque:
      21 N*m{ 214 kgf*cm , 16 ft.*lbf }

    2. Apply a light amount of soapy water (or other fluid for detecting fuel leakage) on the nozzle leakage pipe connection.

    3. A154542E01
      Install SST (turbocharger pressure gauge) to the fuel return side of the leakage pipe, and maintain 100 kPa (1.0 kgf/cm2, 14.5 psi) of pressure for 60 seconds to check that no bubbles form.
      SST
      09992-00242  

      NOTICE:
      Before checking for leakage, be sure to remove the ball and spring in the check valve.

    4. After checking for fuel leaks, wipe off the soapy water from the leakage pipe connection.

    5. Remove SST, the No. 2 nozzle leakage pipe and gasket.

      SST
      09992-00242  
      09280-00010  

      NOTICE:
      Never reinstall the disassembled check valve on the engine.


3. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

  1. A272954E01
    Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover in the directions shown in the illustration.

    NOTICE:
    1. Do not install the No. 3 cylinder head cover gaskets at an angle.
    2. Check that there is no foreign matter at the installation location of the No. 3 cylinder head cover gaskets.

  1. Remove any old seal packing (FIPG) material from the cylinder head.

  1. A060179E01
    Apply seal packing to the specific areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the head cover within 3 minutes after applying seal packing.
    3. Do Not start the engine for at least 2 hours after installing the seal packing.

  1. G034877E01
    Install the a new gasket and cylinder head cover with the 10 bolts and 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Install 4 new Nozzle holder seals.

  1. Connect the ventilation hose.

  1. A152277
    Connect the 4 connectors and install the 3 bolts.


4. INSTALL NO. 4 INJECTION PIPE

NOTICE:
  1. When replacing the injector, also replace the injection pipe.
  2. Keep the joints of the injection pipe clean.

  1. A152275
    Temporarily install the No. 4 injection pipe with the union nuts.

  1. Install new injection pipe clamp with the bolt.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    NOTICE:
    1. Make sure that the inner-rubbers of the injection pipe fit inside the clamp.
    2. When installing the pipe, check that the inner rubbers and the clamp are in their proper positions.

  1. A152280E01
    Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    without union nut wrench:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    with union nut wrench:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.81 in.). If using a torque wrench with a length that is not 30 cm, calculate the torque specification for the torque wrench and union nut wrench based on the "without SST" torque specification (Click here).
    2. Make sure union nut wrench and wrench are connected in a straight line.

  1. Using a union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    without union nut wrench:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    with union nut wrench:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.81 in.). If using a torque wrench with a length that is not 30 cm, calculate the torque specification for the torque wrench and union nut wrench based on the "without union nut wrench" torque specification (Click here).
    2. Make sure union nut wrench and wrench are connected in a straight line.


5. INSTALL EGR COOLER ASSEMBLY
  1. Install the EGR cooler assembly (Click here).


6. INSTALL NO. 1, NO. 2 AND NO. 3 INJECTION PIPE

NOTICE:
  1. When replacing the injector, also replace the injection pipe.
  2. Keep the joints of the injection pipe clean.

  1. Temporarily install the No. 1, No. 2 and No. 3 injection pipes with the union nuts.

  1. A153423E01
    Install the No. 2 and No. 3 injection pipe clamps with the 2 bolts and 2 nuts, as shown in the illustration.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    HINT:
    If the painted mark on the No. 1 injection pipe has disappeared, use the illustration as a reference to install the clamps.

  1. A152279E01
    Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the common rail side.

    Torque:
    without union nut wrench:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    with union nut wrench:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.81 in.). If using a torque wrench with a length that is not 30 cm, calculate the torque specification for the torque wrench and union nut wrench based on the "without union nut wrench" torque specification (Click here).
    2. Make sure union nut wrench and wrench are connected in a straight line.

  1. Using a 17 mm union nut wrench, tighten the injection pipe union nuts on the injector side.

    Torque:
    without union nut wrench:
    35 N*m{ 357 kgf*cm , 26 ft.*lbf }
    with union nut wrench:
    32 N*m{ 326 kgf*cm , 24 ft.*lbf }

    HINT:
    1. Use a torque wrench with a fulcrum length of 30 cm (11.81 in.). If using a torque wrench with a length that is not 30 cm, calculate the torque specification for the torque wrench and union nut wrench based on the "without SST" torque specification (Click here).
    2. Make sure union nut wrench and wrench are connected in a straight line.


7. CHECK FOR INJECTOR COMPENSATION CODE

HINT:
If the injector compensation code is not correctly registered, it may cause malfunctions.

  1. Read the injector compensation code (Click here).

  1. Check that compensation code of installed injector is same as code registered in ECM. If the code is not as specified, register the injector compensation code on the injector (Click here).


8. INSTALL INTERCOOLER ASSEMBLY
  1. Install the intercooler assembly (Click here).


9. ADD FUEL

10. TIGHTEN FUEL TANK CAP ASSEMBLY

11. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


12. PERFORM REGISTRATION
  1. Perform registration of injector compensation codes (Click here).

  1. Perform registration of pilot quantity learning (Click here).


13. BLEED AIR FROM FUEL SYSTEM

  1. A098962E02
    Using the hand pump mounted on the fuel filter cap, bleed the air from the fuel system. Continue pumping until the pump resistance increases.

    NOTICE:
    1. Hand pump pumping speed: Max. 2 strokes/ sec.
    2. The hand pump must be pushed with a full stroke during pumping.
    3. When the fuel pressure at the supply pump inlet port reaches a saturated pressure, the hand pump resistance increases.
    4. If pumping is interrupted during the air bleeding process, fuel in the fuel line may return to the fuel tank. Continue pumping until the hand pump resistance increases.
    5. If the hand pump resistance does not increase despite consecutively pumping 200 times or more, there may be a fuel leak between the fuel tank and fuel filter, the hand pump may be malfunctioning, or the vehicle may have run out of fuel.
    6. If air bleeding using the hand pump is incomplete, the common rail pressure does not rise to the pressure range necessary for normal use, and the engine cannot be started.

  1. Start the engine.

    NOTICE:
    1. Even if air bleeding using the hand pump has been completed, the starter may need to be cranked for 10 seconds or more to start the engine.
    2. Do not crank the engine continuously for more than 20 seconds. The battery may be discharged.
    3. Use a fully-charged battery.


    1. When the engine can be started, proceed to the next step.

    2. If the engine cannot be started, bleed the air again using the hand pump until the hand pump resistance increases (refer to the procedures above). Then start the engine.

  1. Turn the ignition switch off.

  1. Connect the intelligent tester to the DLC3.

  1. Turn the ignition switch to ON and turn the intelligent tester on.

  1. Clear the DTCs (Click here).

  1. Start the engine.*1

  1. A194065E03
    Enter the following menus: Powertrain / Engine and ECT / Active Test / Test the Fuel Leak.*2

  1. Perform the following test 5 times with on/off intervals of 10 seconds: Active Test / Test the Fuel Leak.*3

  1. Allow the engine to idle for 3 minutes or more after performing the Active Test for the fifth time.

    A192848E05

    HINT:
    When the Active Test "Test the Fuel Leak" is used to change the pump control mode, the actual fuel pressure inside the common rail drops below the target fuel pressure when the Active Test is off, but this is normal and does not indicate a pump malfunction.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

  1. Clear the DTCs (Click here).

    HINT:
    It is necessary to clear the DTCs as DTC P1604 or P1605 may be stored when air is bled from the fuel system after replacing or repairing fuel system parts.

  1. Repeat steps *1 to *3.

  1. Enter the following menus: Powertrain / Engine and ECT / DTC.

  1. Read Current DTCs.

    OK:
    No DTCs are output.


14. REGISTER INJECTOR COMPENSATION CODE
  1. Register the injector compensation code (Click here).


15. CHECK FOR FUEL LEAKS

A111544E01

CAUTION:
  1. During Active Test mode, engine speed becomes high and combustion noise becomes loud, so pay attention.
  2. During Active Test mode, fuel becomes high-pressured. Be extremely careful not to expose your eyes, hands, or body to escaped fuel.

  1. Check that there are no leaks from any part of the fuel system when the engine is stopped. If there is fuel leakage, repair or replace parts as necessary.

  1. Start the engine and check that there are no leaks from any part of the fuel system. If there is fuel leakage, repair or replace parts as necessary.

  1. Disconnect the return hose from the common rail.

  1. Start the engine and check for fuel leaks from the return pipe.
    If there is fuel leakage, replace the common rail.

  1. Connect the intelligent tester to the DLC3.

  1. Start the engine and push the intelligent tester main switch ON.

  1. Select the Fuel Leak test from the Active Test mode on the intelligent tester.

  1. If the intelligent tester is not available, fully depress the accelerator pedal quickly. Increase the engine speed to the maximum and maintain that speed for 2 seconds. Repeat this operation several times.

  1. Check that there are no leaks from any part of the fuel system.

    NOTICE:
    A return pipe leakage of less than 10 cc (0.6 cu in.) per minute is acceptable.

    If there is fuel leakage, repair or replace parts as necessary.

  1. Reconnect the return hose to the common rail.


16. CHECK FOR OIL LEAKS
← INSTALLATION (Jun 2011 – Jul 2012)INSTALLATION (from Aug 2013) →