Home › Engine / Hybrid System › 2KD-FTV ENGINE CONTROL › ECM › 2012.04–2012.10
RM1840EF _51 Engine / Hybrid System _009568 2KD-FTV ENGINE CONTROL _0052060 ECM A

2KD-FTV ENGINE CONTROL  ECM  INSTALLATION  


PROCEDURE

Hide 1.INSTALL NO. 2 ECM BRACKET

a.

Install the No. 2 ECM bracket with the 2 screws.

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


Hide 2.INSTALL NO. 1 ECM BRACKET

a.

w/ DPF:

Install the No. 1 ECM bracket with the 2 screws.

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


b.

w/o DPF:

Install the No. 1 ECM bracket with the 3 screws.

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


Hide 3.INSTALL ECM

a.

Install the ECM with the bolt and 2 nuts.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


b.

w/ DPF:

Connect the 6 connectors.


c.

w/o DPF:

Connect the 4 connectors.


Hide 5.INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY

Hide 6.PERFORM REGISTRATION

a.

Perform registration (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(for DPF)>REGISTRATION).

HINT:

Only perform registration when the ECM is replaced, either by itself or in any of the following combinations.

·

ECM and Fuel Supply Pump

·

ECM and Diesel Throttle Body Assembly

·

ECM and Injector Assembly

·

ECM and Engine Assembly




Hide 7.START ENGINE

a.

When replacing the ECM, start the engine to initialize the new ECM (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(for DPF)>INITIALIZATION).