1.INSTALL DIESEL THROTTLE BODY ASSEMBLY
Install a new gasket and the diesel throttle body with the 2 bolts and 2 nuts.
Connect the 2 connectors.
2.INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY (w/o Intercooler)
Connect the No. 2 air cleaner pipe with the 2 air hoses and install the bolt.
Tighten the 2 clamps.
Connect the vacuum hose to the gas filter.
Connect the manifold absolute pressure sensor connector.
3.INSTALL ENGINE COVER BRACKET (w/ No. 1 Engine Cover)
Install the engine cover bracket with the 2 bolts.
4.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (w/ No. 1 Engine Cover)
Attach the 4 claws to the pins of the cover bracket and install the No. 1 engine cover.
5.INSTALL INTERCOOLER ASSEMBLY (w/ Intercooler)
6.PERFORM DIESEL THROTTLE BODY INITIALIZATION
w/ Intercooler: (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(w/ EGR Cooler)>INITIALIZATION)
w/o Intercooler: (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>INITIALIZATION)