The injector driver drives the injectors at high speeds with a high-voltage DC/DC converter. The ECM constantly monitors the injector driver and stops the engine if an abnormal condition is detected.
Refer to DTC P0200 (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>P0200).
After replacing the ECM, the new ECM needs registration (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>REGISTRATION) and initialization (See page Engine / Hybrid System>2KD-FTV ENGINE CONTROL>ECD SYSTEM(w/o EGR Cooler)>INITIALIZATION).
Inspect the fuses of circuits related to this system before performing the following inspection procedure.
Disconnect the injector driver connectors.
| *a | Front view of wire harness connector
(to Injector Driver) |
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| C43-2 (+B) - C43-3 (GND) | Ignition switch ON | 11 to 14 V |
Reconnect the injector driver connector.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the No. 1 integration relay (EDU).
Click hereEngine / Hybrid System>2KD-FTV ENGINE CONTROL>RELAY>ON-VEHICLE INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the injector driver connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C43-2 (+B) - 1J-8 | Always | Below 1 Ω |
| C43-3 (GND) - Body ground | Always | Below 1 Ω |
| C43-2 (+B) or 1J-8 - Body ground | Always | 10 kΩ or higher |
Reconnect the injector driver connector.
Reinstall the No. 1 integration relay.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G39-10 (IREL) - 1J-7 | Always | Below 1 Ω |
| G39-10 (IREL) or 1J-7 - Body ground | Always | 10 kΩ or higher |
Reconnect the ECM connector.
Reinstall the No. 1 integration relay.
| Proceed to |
|---|
| OK |
| NG |
OK
NG