INITIALIZATION
Perform initialization (throttle position) after replacing the throttle body with motor assembly or cleaning any throttle body components (See page Engine / Hybrid System>1GR-FE ENGINE CONTROL>THROTTLE BODY>INSTALLATION).
Perform initialization (throttle position) after reconnecting the battery cable or replacing the ECM (See page Engine / Hybrid System>1GR-FE ENGINE CONTROL>THROTTLE BODY>INSTALLATION).
Perform Reset Memory (AT initialization) when replacing the automatic transmission assembly, engine assembly or ECM (See page Drivetrain>A750F AUTOMATIC TRANSMISSION / TRANSAXLE>AUTOMATIC TRANSMISSION SYSTEM(for 1GR-FE)>INITIALIZATION).
If the ECM is replaced, register the ECM communication ID for Immobiliser System (Refer to the Service Bulletin for Registration).
Initialization cannot be completed only by disconnecting the cable from the battery terminal.
DISCONNECT AND RECONNECT CABLE OF NEGATIVE BATTERY TERMINAL
| *1 | Negative (-) Battery Terminal |
| *2 | Cable |
Before performing electronic work, disconnect the cable from the negative (-) battery terminal in order to prevent it from shorting and burning out.
Before disconnecting and reconnecting the battery cable, turn the ignition switch off and the headlight dimmer switch off. Then loosen the terminal nut completely. Do not damage the cable or terminal.
When the battery cable is disconnected, the clock and radio settings and stored DTCs are cleared. Therefore, before disconnecting the battery cable, make a note of the settings.
When disconnecting the cable, some systems need to be initialized after the cable is reconnected.