1.INSTALL EXHAUST MANIFOLD
Install a new gasket, exhaust manifold and 8 plate washers to the cylinder head with 8 new nuts.
Tighten the nuts in the order shown in the illustration.
2.CLEAN TURBOCHARGER SUB-ASSEMBLY
3.INSTALL TURBOCHARGER SUB-ASSEMBLY
Temporarily install a new gasket and the turbocharger with 3 new nuts.
When installing the turbo oil pipe, loosely install the 3 nuts so that the turbocharger and cylinder head can be aligned easily.
Temporarily install the turbo oil pipe and manifold stay.
| *1 | New Gasket | *2 | Claw |
| *3 | Narrow | *4 | Wide |
|
Outside | - | - |
Wash the oil pipe before installing it.
Temporarily install a new gasket and the turbo oil pipe with the 2 nuts, but only loosely install the nuts.
The notch (wide part) of the gasket must face the engine.
Temporarily install a new gasket and the turbo oil pipe with the 2 bolts (labeled: A), but only loosely install the bolts.
The claws of the gasket must face the turbo oil pipe.
Temporarily install a new gasket and the turbo oil pipe with the union bolt (labeled: B), but only loosely install the union bolt.
Temporarily install the manifold stay with the 2 bolts.
The manifold stay's indented area must face the turbocharger.
Tighten the bolts and nuts.
Tighten the 3 nuts of the turbocharger.
Tighten the 2 nuts of the turbo oil pipe.
Tighten the 2 bolts of the turbo oil pipe.
Tighten the union bolt.
Tighten the 2 bolts of the manifold stay.
4.INSTALL TURBINE OUTLET ELBOW
Temporarily install a new gasket and the turbine outlet elbow (with turbocharger stay) to the turbocharger with the 4 new nuts.
Temporarily install the turbocharger stay with the 4 bolts.
Tighten the 4 nuts of the turbocharger.
Tighten the 4 bolts of the turbocharger stay.
5.INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY
6.INSTALL VENTILATION HOSE HEAT INSULATOR
Install the ventilation hose heat insulator with the 2 bolts.
7.INSTALL AIR CLEANER ASSEMBLY
Connect the No. 1 air cleaner hose.
Install the cleaner with the 2 bolts.
Tighten the hose clamp.
w/ Mass Air Flow Meter:
Connect the connector to the mass air flow meter.
w/o Mass Air Flow Meter:
Attach the clamp and connect the intake air temperature sensor connector.
8.INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY (w/ No. 1 Engine Cover)
9.INSTALL FRONT EXHAUST PIPE ASSEMBLY
10.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).
11.INSPECT FOR OIL LEAK
12.INSPECT FOR EXHAUST GAS LEAK
13.INSTALL FRONT FENDER APRON SEAL UPPER
for 4WD:
Install the front fender apron seal upper with the 5 clips.
for 2WD:
Install the front fender apron seal upper with the 6 clips.
14.INSTALL FRONT FENDER SEAL
Install the front fender seal with the 5 clips.
15.INSTALL NO. 2 ENGINE UNDER COVER (for 4WD and Pre-Runner)
16.INSTALL NO. 1 ENGINE UNDER COVER (for 4WD and Pre-Runner)