Home › Engine / Hybrid System › 1GR-FE COOLING › THERMOSTAT › from 2012.10
RM1840EF _51 Engine / Hybrid System _009597 1GR-FE COOLING _0052384 THERMOSTAT A

1GR-FE COOLING  THERMOSTAT  INSTALLATION  


PROCEDURE

Hide 1.INSTALL WATER INLET SUB-ASSEMBLY WITH THERMOSTAT

a.

Install a new gasket to the water inlet sub-assembly with thermostat.


b.

Install the water inlet sub-assembly with thermostat with the 3 nuts.

Torque:
9.0 N*m (92 kgf*cm, 80 in.*lbf)


Hide 2.CONNECT RADIATOR HOSE OUTLET

a.

Connect the radiator hose outlet to the water inlet sub-assembly with thermostat.


Hide 7.INSTALL ENGINE SIDE COVER SUB-ASSEMBLY RH

Hide 8.INSTALL ENGINE SIDE COVER SUB-ASSEMBLY LH