Home › Suspension › REAR SUSPENSION › REAR LEAF SPRING(for 4WD and Pre-Runner)
RM1840EF _53 Suspension _009621 REAR SUSPENSION _0052588 REAR LEAF SPRING(for 4WD and Pre-Runner) A

REAR SUSPENSION  REAR LEAF SPRING(for 4WD and Pre-Runner)  INSTALLATION  


CAUTION / NOTICE / HINT

HINT:
·

Use the same procedure for the RH and LH sides.

·

The procedure listed below is for the LH side.

·

A bolt without a torque specification is shown in the standard bolt chart.



PROCEDURE

Hide 1.INSTALL REAR LEAF SPRING ASSEMBLY LH

a.

Install the spring to the vehicle body.


Hide 2.INSTALL NO. 2 REAR SPRING SHACKLE SUB-ASSEMBLY

a.

Install the spring shackle to the spring and vehicle frame.


Hide 3.TEMPORARILY INSTALL SPRING SHACKLE INNER PLATE

a.

Temporarily install the inner plate to the shackle No. 2 with the 2 washers and 2 nuts.

HINT:

After stabilizing the suspension, tighten the nuts.



Hide 4.TEMPORARILY INSTALL REAR LEAF SPRING PIN BOLT

a.

Temporarily install the pin bolt with the washer and nut.

HINT:
·

The pin bolt can be installed from either side of the spring.

·

After stabilizing the suspension, tighten the nut.




Hide 5.TEMPORARILY INSTALL REAR SPRING U BOLT

a.

Temporarily install the U bolt seat and spring bumper with the 2 U bolts, 4 washers and 4 nuts.

HINT:

When tightening the U bolts, tighten the nuts in diagonal pairs.



Hide 7.CONNECT NO. 3 PARKING BRAKE CABLE ASSEMBLY

a.

Connect the parking brake cable with the bolt.

Torque:
14 N*m (143 kgf*cm, 10 ft.*lbf)


Hide 9.TIGHTEN SPRING SHACKLE INNER PLATE NUT

a.

Tighten the inner plate with the 2 nuts.

Torque:
60 N*m (612 kgf*cm, 44 ft.*lbf)


Hide 10.TIGHTEN REAR SPRING PIN NUT

a.

Tighten the pin nut.

Torque:
120 N*m (1224 kgf*cm, 89 ft.*lbf)


Hide 11.TIGHTEN SPRING U BOLT SET NUT

a.

Tighten the set nut.

Torque:
120 N*m (1224 kgf*cm, 89 ft.*lbf)


Hide 12.INSTALL REAR WHEEL

a.

Install the wheel.

Torque:
105 N*m (1070 kgf*cm, 77 ft.*lbf)