Home › Power Source / Network › 2TR-FE BATTERY / CHARGING › GENERATOR › 2012.01–2012.04
RM1840EF _57 Power Source / Network _009636 2TR-FE BATTERY / CHARGING _0052672 GENERATOR A

2TR-FE BATTERY / CHARGING  GENERATOR  INSTALLATION  


PROCEDURE

Hide 1.INSTALL GENERATOR ASSEMBLY

a.

Install the generator with the 2 bolts.

Torque:
43 N*m (438 kgf*cm, 32 ft.*lbf)


b.

Install the generator wire with the bolt and nut.

Torque:
for nut : 9.8 N*m (100 kgf*cm, 87 in.*lbf)
for bolt : 13 N*m (133 kgf*cm, 10 ft.*lbf)


c.

Attach the terminal cap.


d.

Connect the generator connector.


Hide 4.INSTALL INTAKE AIR CONNECTOR AND AIR CLEANER ASSEMBLY

Hide 5.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected (See page General>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION).