When the engine is cranked, current flows from terminal ST1 of the ignition switch to the starter relay coil and current also flows to terminal STA of the ECM (STA signal).
When the STA signal and NE signal are input to the ECM, Tr is turned on, current flows to the coil of the circuit opening relay, the relay switches on, power is supplied to the fuel pump and the fuel pump operates.
While the NE signal is generated (engine running), the ECM keeps Tr on (circuit opening relay on) and the fuel pump continues operating.
Inspect the fuses for circuits related to this system before performing the following inspection procedure.
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON.
Turn the tester on.
Enter the following menus: Powertrain / Engine and ECT / Active Test / Control the Fuel Pump / Speed.
| Tester Display |
|---|
| Control the Fuel Pump / Speed |
Check whether the fuel pump operation sound occurs when performing the Active Test on the tester.
Fuel pump operating sound occurs.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the No. 1 integration relay (C/OPN).
Click hereEngine / Hybrid System>2TR-FBE ENGINE CONTROL>RELAY>ON-VEHICLE INSPECTION
Inspect the No. 1 integration relay (MAIN).
Click hereEngine / Hybrid System>2TR-FBE ENGINE CONTROL>RELAY>ON-VEHICLE INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the ECM connector.
Remove the integration relay (C/OPN) from the engine room relay block.
Disconnect the integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1J-7 - G146-25 (FC) | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1J-7 or G146-25 (FC) - Body ground | Always | 10 kΩ or higher |
Reconnect the ECM connector.
Reconnect the integration relay connector.
Reinstall the integration relay (C/OPN).
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Remove the integration relay from the engine room relay block.
Disconnect the integration relay connector.
Disconnect the ignition switch assembly connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G9-6 (IG2) - 1J-6 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G9-6 (IG2) or 1J-6 - Body ground | Always | 10 kΩ or higher |
Reconnect the ignition switch assembly connector.
Reconnect the integration relay connector.
Reconnect the fuel pump connector.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the fuel pump connector.
Remove the integration relay from the engine room relay block.
Disconnect the integration relay connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1J-8 - L4-4 | Always | Below 1 Ω |
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1J-8 or L4-4 - Body ground | Always | 10 kΩ or higher |
Reconnect the integration relay connector.
Reinstall the integration relay.
Reinstall the integration relay.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Disconnect the fuel pump connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| L4-5 - Body ground | Always | Below 1 Ω |
Reconnect the fuel pump connector.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the fuel pump.
Click hereEngine / Hybrid System>2TR-FBE FUEL>FUEL PUMP(for Fuel Main Tank)>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Check the ECM power source circuit.
Click hereEngine / Hybrid System>2TR-FBE ENGINE CONTROL>SFI SYSTEM>ECM Power Source Circuit
| Proceed to |
|---|
| OK |
| NG |
OK
NG