When the ignition switch is turned to ON, the battery voltage is applied to terminal IGSW of the ECM. The MREL output signal from the ECM causes a current to flow to the coil, closing the contacts of the MAIN relay and supplying power to terminal +B of the ECM.
After replacing the ECM, the new ECM needs registration (See page Engine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(for i-ART)>REGISTRATION) and initialization (See page Engine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(for i-ART)>INITIALIZATION).
Inspect the fuses of circuits related to this system before performing the following inspection procedure.
| *a | Component with harness connected
(ECM) |
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| G157-24 (+B) - C164-6 (E1) | Ignition switch ON | 11 to 14 V |
| G157-17 (+B2) - C164-6 (E1) | Ignition switch ON | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
Click hereEngine / Hybrid System>1KD-FTV ENGINE CONTROL>ECD SYSTEM(for i-ART)>PROBLEM SYMPTOMS TABLE
NG
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| C164-6 (E1) - Body ground | Always | Below 1 Ω |
Reconnect the ECM connector.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *a | Component with harness connected
(ECM) |
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| G156-24 (IGSW) - C164-6 (E1) | Ignition switch ON | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
| *a | Component with harness connected
(ECM) |
Turn the ignition switch to ON.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
|---|---|---|
| G156-11 (MREL) - C164-6 (E1) | Ignition switch ON | 11 to 14 V |
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the No. 1 integration relay (MAIN relay).
Click hereEngine / Hybrid System>1KD-FTV ENGINE CONTROL>RELAY>ON-VEHICLE INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Check the harness and connector between the No. 1 integration relay (MAIN relay) and ECM.
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the ECM connector.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1J-4 - G157-24 (+B) | Always | Below 1 Ω |
| 1J-5 - G157-17 (+B2) | Always | Below 1 Ω |
| 1J-2 - G156-11 (MREL) | Always | Below 1 Ω |
| 1J-4 or G157-24 (+B) - Body ground | Always | 10 kΩ or higher |
| 1J-5 or G157-17 (+B2) - Body ground | Always | 10 kΩ or higher |
| 1J-2 or G156-11 (MREL) - Body ground | Always | 10 kΩ or higher |
Reconnect the ECM connector.
Reinstall the No. 1 integration relay.
Check the harness and connector between the No. 1 integration relay (MAIN relay) and body ground.
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Measure the resistance according to the value(s) in the table below.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| 1J-3 - Body ground | Always | Below 1 Ω |
Reinstall the No. 1 integration relay.
| Proceed to |
|---|
| OK |
| NG |
OK
NG
Inspect the ignition switch.
Click hereEngine / Hybrid System>1KD-FTV STARTING>IGNITION SWITCH>INSPECTION
| Proceed to |
|---|
| OK |
| NG |
OK
NG