Home › ENGINE ยท 1GR-FE › ENGINE CONTROL SYSTEM › CRANKSHAFT POSITION SENSOR

CRANKSHAFT POSITION SENSOR > INSTALLATION

for Preparation Click here



1. INSTALL CRANKSHAFT POSITION SENSOR


    A076417E01
  1. Apply a light coat of engine oil to the O-ring of the sensor.

  1. Install the sensor with the bolt.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the sensor connector.



2. INSTALL COOLER COMPRESSOR ASSEMBLY (w/ Air Conditioning System)


    A112978E01
  1. Temporarily install the compressor with the bolt labeled A.

  1. Install the compressor completely by tightening the 4 bolts in the order shown in the illustration.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }

    NOTICE:
    In order to prevent misalignment, which causes belt rattle, tightening of the bolts must be performed in the order shown.

  1. Connect the compressor connector.



    A112977
  1. Connect the suction hose with the 2 bolts.

    Torque:
    5.4 N*m{ 55 kgf*cm , 48 in.*lbf }



3. INSTALL GENERATOR ASSEMBLY (w/ Air Conditioning System)


A112761
  1. Install the generator and adjusting bar with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Install the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.

  1. Connect the generator connector.



4. INSTALL IDLER PULLEY (w/o Air Conditioning System)


    A121584
  1. Install the idler pulley with the 3 bolts.

    Torque:
    25 N*m{ 255 kgf*cm , 18 ft.*lbf }



5. INSTALL DRIVE BELT


    A076442E01
  1. While turning the belt tensioner counterclockwise, align its holes, and then insert a bar of 6.0 mm (0.24 in.) into the holes to fix the belt tensioner.

  1. Install the V-ribbed belt.

  1. While turning the belt tensioner counterclockwise, remove the bar.



  1. If it is hard to install the V-ribbed belt, perform the following procedure.



      A113028E02
    1. Put the V-ribbed belt on everything except the P/S pump as shown in the illustration.

    2. While releasing the belt tension by turning the belt tensioner counterclockwise, put the V-ribbed belt on the P/S pump.



6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL


7. PERFORM INITIALIZATION
  1. Perform initialization (Click here).

    NOTICE:
    Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.