Home › ENGINE ยท 2KD-FTV › ENGINE CONTROL SYSTEM › DIESEL THROTTLE BODY

DIESEL THROTTLE BODY > INSTALLATION

for Preparation Click here



1. INSTALL DIESEL THROTTLE BODY ASSEMBLY
  1. Install a new gasket and the diesel throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the 2 connectors.



2. INSTALL NO. 2 AIR CLEANER PIPE SUB-ASSEMBLY
  1. Connect the No. 2 air cleaner pipe with the 2 air hoses and install the bolt.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 clamps.

  1. Connect the vacuum hose to the gas filter.

  1. Connect the manifold absolute pressure sensor connector.



3. PERFORM DIESEL THROTTLE BODY INITIALIZATION
(Click here)