Home › ENGINE ยท 1KD-FTV › ENGINE MECHANICAL › ENGINE UNIT

ENGINE UNIT > REASSEMBLY

for Preparation Click here


NOTICE:
  1. When replacing the injectors (including shuffling the injectors between the cylinders), common rail or cylinder head, it is necessary to replace the injection pipes with new ones.
  2. When replacing the fuel supply pump, common rail, cylinder block, cylinder head, cylinder head gasket or timing gear case, it is necessary to replace the fuel inlet pipe with a new one.



1. INSTALL TURBO WATER HOSE UNION
  1. Clean the cylinder block side hole and new turbo water hose union with non-residue solvent.



    A330616E02
  1. Apply adhesive onto the shaded area of a turbo water hose union as shown in the illustration.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

    Text in Illustration 
    *a
    Front
    *b
    5.0 mm (0.197 in.)
    *c
    2.0 mm (0.787 in.)
    *d
    Adhesive

    NOTICE:
    Install the turbo water hose union within 3 minutes after applying adhesive.

  1. Set the turbo water hose union and tap it until the edge of the turbo water hose union fits against the chamfered part of the cylinder block as shown in the illustration.



2. INSTALL TIGHT PLUG


    A058129E03
  1. Apply adhesive to the end of a new tight plug.

    Adhesive:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    Do not start the engine for 1 hour after the installation.

  1. Position A:
    Using a 14 mm steel bar and hammer, tap in the tight plug as shown in the illustration.



  1. Other Positions:
    Using SST and a hammer, tap in a new tight plug as shown in the illustration.
    Position B

    SST
    09950-60010   (09951-00180)
    09950-70010   (09951-07100)
    Position C
    SST
    09950-60010   (09951-00190)
    09950-70010   (09951-07100)
    Position D
    SST
    09950-60010   (09951-00200)
    09950-70010   (09951-07100)
    Position E
    SST
    09950-60010   (09951-00350)
    09950-70010   (09951-07100)
    Position F
    SST
    09950-60010   (09951-00400, 09951-00450)
    09950-70010   (09951-07100)
    Position G
    SST
    09950-60010   (09951-00450)
    09950-70010   (09951-07100)


    A061385E03



3. INSTALL STUD BOLT



A070174E01



4. INSTALL STRAIGHT PIN



A061387E01



5. INSTALL RING PIN



A061388E04



6. INSTALL NO. 1 STRAIGHT SCREW PLUG
  1. Install a new gasket and the screw plug.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }



7. INSTALL NO. 1 OIL NOZZLE SUB-ASSEMBLY


A060268E01
  1. Align the pin of the oil nozzle with the pin hole of the cylinder block.

  1. Install the oil nozzle with the check valve. Install the 4 oil nozzles and check valves.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }



8. INSTALL PISTON PIN


A060203E01


  1. Assemble the piston and connecting rod.

    1. Using a small screwdriver, install a new snap ring on one side of the piston pin hole.



    2. A060230E01
    3. Gradually heat the piston to about 80°C (176°F).



    4. A149783E01
    5. Coat the piston pin with engine oil.

    6. Align the front marks of the piston and connecting rod, and push in the piston pin with your thumb.



    7. A060232E01
    8. Check fit between the piston and piston pin. Try to move the piston back and forth on the piston pin.



    9. A060202E01
    10. Using a small screwdriver, install a new snap ring on the other side of the piston pin hole.



    A057162E03
  1. Install the piston rings.

    1. Install the coil and oil ring by hand.

      HINT:
      Face the end gap of the oil ring in the opposite direction of the coil joint.



    2. A061389E02
    3. Using a piston ring expander, install the No. 1 and No. 2 piston rings with the code mark facing upward.
      Item
      Specified Condition
      No. 1 Piston Ring
      w/ EGR Cooler
      NAA
      w/o EGR Cooler
      NKD
      No. 2 Piston Ring
      N



    4. A149789E01
    5. Position the piston rings so that the ring ends are as shown.

      NOTICE:
      Do not align the ring ends.



9. INSTALL CONNECTING ROD BEARING


A060205E01
  1. Align the bearing claw with the groove of the connecting rod or connecting cap.

  1. Install the bearings in the connecting rod and connecting rod cap.



10. INSTALL CRANKSHAFT BEARING


A060228E01

HINT:
Upper bearings have an oil groove and oil hole. Lower bearings do not.

  1. Align the bearing claw with the claw groove of the cylinder block, and push in the 5 upper bearings.

  1. Align the bearing claw with the claw groove of the crankshaft bearing cap, and push in the 5 lower bearings.



11. INSTALL CRANKSHAFT


A060188E02
  1. Place the crankshaft on the cylinder block.

  1. Install the 2 upper thrust washers to the No. 5 journal position of the cylinder block.

    1. Push the crankshaft toward the front (rear) side.

    2. Install the 2 thrust washers with the oil grooves facing outward.



    A060189E03
  1. Install the 2 thrust washers on the No. 5 bearing cap with the grooves facing outward.



    A060226E01
  1. Install the 5 crankshaft bearing caps in their proper locations.



    A060270E02
  1. Install the crankshaft bearing cap bolts.

    HINT:
    1. The main bearing cap bolts are tightened in 2 progressive steps.
    2. If a main bearing cap bolt is broken or deformed, replace it.


    1. Apply a light coat of the engine oil on the threads and under the bolt heads of the main bearing caps.

    2. Install and uniformly tighten the 10 bolts of the main bearing caps in several passes in the sequence shown in the illustration.

      Torque:
      50 N*m{ 510 kgf*cm , 37 ft.*lbf }

      If any one of the bearing cap bolts does not meet the torque specification, replace the bearing cap bolt.



    3. A060271E03
    4. Mark the front of the main bearing cap bolt with paint.

    5. Retighten the main bearing cap bolts 90° in the numerical order shown above.

    6. Check that the painted mark is now at a 90° angle to the front.

  1. Check that the crankshaft turns smoothly.

  1. Check the crankshaft thrust clearance.



12. INSTALL PISTON AND CONNECTING ROD


    A149791E01
  1. Using a piston ring compressor, push the correctly numbered piston and connecting rod assembly into the cylinder with the front mark of the piston facing forward.



    A060237E01
  1. Place the connecting rod cap on the connecting rod.

    1. Match the numbered connecting rod cap with the connecting rod.

    2. Align the pins of the connecting rod cap with the pin holes of the connecting rod, and install the connecting rod cap.



    3. A060238E01
    4. Check that the front mark of the connecting rod cap is facing forward.



    A060235E01
  1. Install the connecting rod cap bolts.

    HINT:
    1. The connecting rod cap bolts are tightened in 2 progressive steps.
    2. If any connecting rod bolt is broken or deformed, replace it.


    1. Apply a light of engine oil on the threads and under the heads of the connecting rod cap bolts.

    2. Install and alternately tighten the bolts of the connecting rod cap in several passes.

      Torque:
      35 N*m{ 357 kgf*cm , 26 ft.*lbf }

      If any one of the connecting rod cap bolts does not meet the torque specification, replace the cap bolts.



    3. A060197E02
    4. Mark the front of the connecting rod cap bolts with paint.

    5. Retighten the connecting rod cap bolts 90° as shown.

    6. Check that the painted mark is now at a 90° angle to the front.

  1. Check that the crankshaft turns smoothly.

  1. Check the connecting rod thrust clearance .



13. INSTALL CYLINDER BLOCK OIL ORIFICE


14. INSTALL REAR ENGINE OIL SEAL RETAINER


A075507E05
  1. Remove any old packing (FIPG) material.

  1. Remove oil seal packing (FIPG) from oil pan and cylinder block.

  1. Apply seal packing to the specific places described in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    3 to 5 mm (0.12 to 0.20 in.)

    NOTICE:
    After applying FIPG, install the engine rear oil seal retainer within 3 minutes and tighten its bolts within 15 minutes.



    A072856E02
  1. Install the retainer with the 7 bolts. Alternately tighten the 7 bolts in several passes.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf } for bolt A
    12 N*m{ 122 kgf*cm , 9 ft.*lbf } for bolt B



15. INSTALL NO. 2 BALANCE SHAFT DRIVEN GEAR


A051335E01
  1. Mount the balance shaft between aluminium plates in a vise.

    NOTICE:
    Be careful not to damage the balance shaft.

  1. Align the balance shaft knock pin with the knock pin hole. Then install the balance shaft thrust washer and balance shaft driven gear.

  1. Install the bolt.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }



16. INSTALL NO. 2 BALANCE SHAFT SUB-ASSEMBLY


A051334E01
  1. Install the balance shaft with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



17. INSTALL NO. 1 BALANCE SHAFT DRIVEN GEAR


A051333E01
  1. Mount the balance shaft between aluminium plates in a vise.

    NOTICE:
    Be careful not to damage the balance shafts.

  1. Align the balance shaft knock pin with the knock pin hole. Then install the balance shaft thrust washer and balance shaft driven gear.

  1. Install the bolt.

    Torque:
    36 N*m{ 367 kgf*cm , 27 ft.*lbf }



18. INSTALL NO. 1 BALANCE SHAFT SUB-ASSEMBLY


A051332E01
  1. Install the balance shaft with the 2 bolts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



19. INSTALL TIMING GEAR CASE ASSEMBLY
  1. Remove any old packing (FIPG) material.



    A075511E02
  1. Apply seal packing to the timing gear case as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    5 mm (0.20 in.)

    NOTICE:
    Install the timing gear case within 3 minutes and tighten its bolts within 15 minutes as soon as applying FIPG is completed.



    A060151E01
  1. Install a new gasket to the groove of the timing gear case.



    A069840E01
  1. Install 2 new O-rings to the cylinder block groove of the timing gear case.



    A069841E01
  1. Align the "2" marks of the balance shaft driven gear No. 1 and oil pump drive gear.

  1. Align the mark on the oil pump drive gear with the mark on the timing gear case.



    A069842E02
  1. Install the timing gear case with the union bolt and 8 bolts.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf } for union bolt (A)
    13 N*m{ 133 kgf*cm , 10 ft.*lbf } for bolt



    A060154E01
  1. Remove the screw plug.

  1. Pour in approx. 20 cc (0.12 cu in.) of engine oil into the oil pump.

  1. Reinstall a new gasket and the screw plug.

    Torque:
    42 N*m{ 423 kgf*cm , 31 ft.*lbf }



20. INSTALL OIL STRAINER SUB-ASSEMBLY
  1. Install a new gasket and the oil strainer with the 2 bolts and nut.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



21. INSTALL OIL PAN SUB-ASSEMBLY


A074129E03
  1. Remove any old packing (FIPG) material.

  1. Apply seal packing to the oil pan as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    5 mm (0.20 in.)

    NOTICE:
    Install the oil pan within 3 minutes and tighten its bolts within 15 minutes as soon as applying FIPG is completed.

  1. Install the oil pan with the 22 bolts and 2 nuts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Install the oil level gauge sensor with the 4 bolts.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }



22. INSTALL CRANKSHAFT TIMING GEAR OR SPROCKET


A061827E01
  1. Face the crankshaft timing gear with timing mark 1 facing the forward.

  1. Align the set key on the crankshaft with the key groove of the crankshaft timing gear.

  1. Using SST and a hammer, tap in the timing gear.

    SST
    09223-00010  



23. INSTALL SUPPLY PUMP GEAR
  1. Install the supply pump with the 2 nuts.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }



    A069843E01
  1. Align the "3" marks of the balance shaft driven gear No. 2 and supply pump gear.



    A069844E01
  1. Install a new O-ring to the supply pump gear.



    A069845E01
  1. Install the supply pump gear set nut.

  1. Using SST, tighten the nut.

    SST
    09960-10010   (09962-01000, 09963-01000)

    Torque:
    64 N*m{ 653 kgf*cm , 47 ft.*lbf }



24. INSTALL NO. 2 IDLE SUB GEAR


A069847E01
  1. Mount the No.1 idle gear in a vise.

    HINT:
    The cut-off mark of the idle gear faces down.

    NOTICE:
    Be careful not to damage the gear.



    A069848E01
  1. Install the idle gear spring.

  1. Install the No. 2 idle sub-gear.

  1. Install the wave washer.

    HINT:
    Fit the pins on the gears to the spring ends.



    A069834E01
  1. Using snap ring pliers, install the snap ring.



    A069850E01
  1. Using SST, align the holes of the No. 1 idle gear and No. 2 idle sub gear by turning the No.2 idle sub gear clockwise, and install a service bolt.

    SST
    09960-10010   (09962-01000, 09963-00700)

  1. Remove the No. 1 idle gear from the vise and turn it upside down.



25. INSTALL NO. 1 IDLE SUB GEAR


A069851E01
  1. Mount the No. 1 idle gear and No. 2 idle sub gear in a vise.

    NOTICE:
    Be careful not to damage the gears.



    A069852E01
  1. Remove the service bolt.



    A069853E01
  1. Install the idle gear spring.

  1. Install the No. 1 idle sub gear.

  1. Install the wave washer.

    HINT:
    Fit the pins on the gears to the spring ends.



    A069832E01
  1. Using a snap ring pliers, install the snap ring.



    A069854E01
  1. Using SST, align the holes of the No. 1 idler gear and No. 1 idle sub gear by turning the No. 1 idle sub gear clockwise, and install a service bolt.

    SST
    09960-10010   (09962-01000, 09963-00600)



26. INSTALL NO. 1 IDLE GEAR


A060159E01
  1. Install the gear shaft as shown in the illustration.



    G036757E01
  1. Align the "5" timing marks of the idle gear and crankshaft timing gear.

  1. Using SST, turn the supply pump gear, and align the "4" timing marks of the idle gear and supply pump gear, and mesh the gears.

    SST
    09960-10010   (09962-01000, 09963-01000)



    A060161E02
  1. Face the thrust plate with the protrusion facing the forward.

  1. Align the bolt holes, and install the thrust plate with the 2 bolts.

    Torque:
    50 N*m{ 510 kgf*cm , 37 ft.*lbf }

  1. Remove the service bolt.



27. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE


A060163E01
  1. Align the set key with the key groove of the sensor plate.

  1. Install the sensor plate, facing the cup side outward.



28. INSTALL TIMING GEAR COVER
  1. Remove any old packing (FIPG) material.



    A059934E01
  1. Apply seal packing to the timing gear cover as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    3 to 5 mm (0.12 to 0.20 in.)

    NOTICE:
    Install the timing gear case within 3 minutes and tighten its bolts within 15 minutes as soon as applying FIPG is completed.



    A060162E01
  1. Install a new O-ring to the timing gear case.



    A060274E01
  1. Install the timing gear cover with the 14 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



29. INSTALL WATER PUMP ASSEMBLY


A225339
  1. Install a new gasket and the water pump with the 5 bolts and 2 nuts.

    Torque:
    13 N*m{ 133 kgf*cm , 10 ft.*lbf }



30. INSTALL CYLINDER HEAD GASKET


    A060285E02
  1. Check the piston protrusions for each cylinder.

    1. Clean the cylinder block with solvent.

    2. Set the piston of the cylinder to be measured to slightly before TDC.
      Text in Illustration 
      *1
      Measuring Tip
      *2
      Protrusion

    3. Place a dial indicator on the cylinder block, and position the measuring tip as shown in the illustration.

    4. Set the dial indicator at 0 mm (0 in.)

      HINT:
      Make sure that the measuring tip is square to the cylinder block gasket surface and piston head when taking the measurements.

  1. Find where the piston head protrudes most by slowly turning the crankshaft clockwise and counterclockwise.



    A058134E02
  1. Measure the piston protrusion of each cylinder at the 2 points shown in the illustration.
    Text in Illustration 
    *1
    Measuring Point

  1. For the piston protrusion value of each cylinder, use the average of the 2 measurements of each cylinder.

    Standard piston protrusion:
    0.005 to 0.255 mm (0.000197 to 0.0100 in.)

    HINT:
    When installing the piston and connecting rod assembly, if the protrusion is not as specified, remove the piston and connecting rod assembly and reinstall them.



    A060174E02
  1. Select a new cylinder head gasket.
    Text in Illustration 
    *1
    Cutout Mark

    HINT:
    New cylinder head gaskets are available in 5 sizes, and are marked A, B, C, D or E.

    New Cylinder Head Gasket Thickness:
    Mark
    Specified Condition
    A
    0.80 to 0.90 mm (0.0315 to 0.0354 in.)
    B
    0.85 to 0.95 mm (0.0335 to 0.0374 in.)
    C
    0.90 to 1.00 mm (0.0354 to 0.0394 in.)
    D
    0.95 to 1.05 mm (0.0374 to 0.0413 in.)
    E
    1.00 to 1.10 mm (0.0394 to 0.0433 in.)


    1. Select the largest piston protrusion value from the measurements made. Then select a new appropriate gasket according to the table below.

      Gasket Size:

      Item
      Specified Condition
      Piston protrusion
      0.005 to 0.054 mm (0.000197 to 0.00213 in.)
      0.055 to 0.104 mm (0.00217 to 0.00409 in.)
      0.105 to 0.154 mm (0.00413 to 0.00606 in.)
      0.155 to 0.204 mm (0.00610 to 0.00803 in.)
      0.205 to 0.255 mm (0.00807 to 0.0100 in.)
      Gasket to be used
      A
      B
      C
      D
      E



    A060144E02
  1. Place the cylinder head gasket on the cylinder block.
    Text in Illustration 
    V100135
    Front

    NOTICE:
    Make sure the gasket is installed facing the proper direction.



31. INSTALL CYLINDER HEAD SUB-ASSEMBLY

HINT:
  1. The cylinder head bolts are tightened in 3 progressive steps.
  2. If any bolt is broken or deformed, replace it.

  1. Place the cylinder head on the cylinder head gasket.

  1. Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.



    A060284E01
  1. Install the 18 cylinder head bolts and 18 washers and uniformly tighten the bolts in several passes in the sequence shown in the illustration.

    Torque:
    85 N*m{ 867 kgf*cm , 63 ft.*lbf }

    Standard Bolt Length 
    Item
    Specified Condition
    A
    110 mm (4.33 in.)
    B
    167 mm (6.57 in.)
    If any of the cylinder head bolts does not meet the torque specification, replace it.



    A060141E03
  1. Mark the front of each cylinder head bolt with paint.
    Text in Illustration 
    *1
    Paint Mark
    *a
    Front

  1. Further tighten the cylinder head bolts by 90° in the sequence shown in the illustration above.

  1. Finally, tighten the cylinder head bolts by an additional 90°.

  1. Check that the paint marks are now facing rearward.



32. INSTALL CAMSHAFT


G036616E01
  1. Using the crankshaft pulley bolt, set the No. 1 cylinder to 90° BTDC/compression.

    HINT:
    Set the No. 1 cylinder to 90° BTDC/compression to avoid interference with the piston top and valve head.



    A060149E01
  1. Install the camshaft.

    1. Apply MP grease to the thrust portion of the camshaft.

    2. Place the camshaft on the cylinder head, facing the key groove upward.



    3. A060150E01
    4. Align the timing marks (1 dot mark) of the camshaft drive and driven main gears, and set the No. 2 camshaft in place.



    A060283E02
  1. Remove any old packing (FIPG) material from the camshaft bearing cap.



  1. Apply seal packing to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Standard seal diameter:
    4 mm (0.16 in.)

    NOTICE:
    1. Do not allow FIPG to contact the oil passage of the bearing cap.
    2. After applying FIPG, install the camshaft bearing caps within 3 minutes and fasten the bolts within 15 minutes.
    3. Do not start the engine for at least 2 hours after the installation.




      A060146E01
    1. Install the 5 bearing caps in their proper locations.



    2. A060147E02
    3. Apply a light coat of engine oil on the threads and under the heads of the bearing cap bolts.

    4. Install and uniformly tighten the 15 bearing cap bolts in several passes in the sequence shown in the illustration.

      Torque:
      19 N*m{ 194 kgf*cm , 14 ft.*lbf }



  1. Install the camshaft oil seal.



      A060145E01
    1. Apply MP grease to the lip of a new oil seal.

    2. Using SST and a hammer, tap in the oil seal until its surface is flush with the oil seal retainer edge.

      SST
      09608-06041  



33. INSPECT AND ADJUST VALVE CLEARANCE
(Click here)


34. INSTALL NO. 2 TIMING BELT COVER


    A060279E01
  1. Apply seal packing (FIPG) to the specified areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    After applying FIPG, install the No. 2 timing belt cover within 3 minutes and tighten its bolts and nut within 15 minutes.

  1. Clean the bolts and their holes.

  1. Apply adhesive to 2 or 3 threads at the end of each of the 4 bolts.

    Adhesive:
    Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

  1. Install the No. 2 timing belt cover with the 4 bolts and nut.

    Torque:
    10 N*m{ 102 kgf*cm , 7 ft.*lbf }



35. INSTALL CAMSHAFT TIMING PULLEY


    A060182E01
  1. Install the camshaft timing pulley.

  1. Tighten the bolt of the camshaft timing pulley while holding the camshaft with a wrench.

    Torque:
    98 N*m{ 1000 kgf*cm , 72 ft.*lbf }



36. INSTALL INJECTOR ASSEMBLY

NOTICE:
Be sure to install each injector, No. 1 nozzle holder clamp, washer and bolt in its original position.



    B008252E01
  1. Install 4 new injection nozzle seats to the cylinder head.

  1. Apply a small amount of clean engine oil to 4 new O-rings.



    G036760E07
  1. Install an O-ring to each injector as shown in the illustration.

  1. Insert the 4 injectors into the cylinder head.

    NOTICE:
    1. Insert the injector until it touches the injection nozzle seat surface.
    2. After installing the injector to the cylinder head, the O-ring may prevent the injector from fully seating. If so, pull out the injector and reinstall it.
    3. Always return an injector to the same place it was removed from.

  1. For an injector that has been replaced with a new injector, register the injector compensation code.

    1. w/ EGR Cooler:
    2. w/o EGR Cooler:



    A060177E05
  1. Temporarily install 4 new washers and the 4 No. 1 nozzle holder clamps with the 4 bolts.

    NOTICE:
    A257064E02
    1. The fork portion of the No. 1 nozzle holder clamp must be set on the injector.
    2. Before tightening the bolts, check that the No. 1 nozzle holder clamps are set properly.
    3. To fasten the clamp bolts, first tighten them by hand until they cannot be turned further. Then, tighten the bolts to the specified torque in a following step.
    4. When tightening the bolts, pay attention so as not to tilt the bolt or clamp.
    5. Do not reuse the washer.
    6. If the nozzle leakage pipe is accidentally tightened beyond the torque specification, it must be replaced.

    HINT:
    Apply a small amount of engine oil to the threads and under the heads of the clamp bolts.

  1. Temporarily install the 4 injection pipes with the union nuts.

    HINT:
    To position the injectors, loosely tighten the union nuts.



    A062123E01
  1. Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
    If scratches or dents are present, replace the nozzle leakage pipe.



    A150714E05
  1. Set the leakage pipe and 5 new gaskets in place.

  1. Apply a small amount of oil to the 4 injector hollow screws and union bolt.

  1. Temporarily install the nozzle leakage pipe with the 4 injector hollow screws and union bolt.

  1. Tighten the 4 holder clamp bolts.

    Torque:
    22 N*m{ 220 kgf*cm , 16 ft.*lbf }

  1. Remove the 4 injection pipes.



    A076779E06
  1. Tighten the 4 injector hollow screws in order from 1 to 4.

    Torque:
    16 N*m{ 163 kgf*cm , 12 ft.*lbf }

    NOTICE:
    If an injector hollow screw is accidentally tightened beyond the torque specification, it must be replaced.

  1. Tighten the union bolt.

    Torque:
    13 N*m{ 127 kgf*cm , 9 ft.*lbf }

    NOTICE:
    If the union bolt is accidentally tightened beyond the torque specification, it must be replaced.



37. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY


    A272954E01
  1. Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover in the directions shown in the illustration.

    NOTICE:
    1. Do not install the No. 3 cylinder head cover gaskets at an angle.
    2. Check that there is no foreign matter at the installation location of the No. 3 cylinder head cover gaskets.

  1. Remove any old seal packing (FIPG material) from the cylinder head.



    A257065E01
  1. Apply seal packing to the specific areas shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the head cover within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 2 hours after installing the seal packing.

  1. Install a new cylinder head cover gasket and the cylinder head cover with the 10 bolts and 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Install 4 new nozzle holder seals.

  1. Connect the ventilation hose.

  1. Connect the 4 connectors and install the 3 bolts.

    Torque:
    13 N*m{ 127 kgf*cm , 9 ft.*lbf }



38. INSTALL NOZZLE HOLDER SEAL
  1. Install 4 new holder seals.



39. INSTALL OIL FILLER CAP SUB-ASSEMBLY