ENGINE UNIT > REASSEMBLY |
| 1. INSTALL STUD BOLT |
Install the stud bolts.

| *a | Front Side | *b | Left Side |
| *c | Oil Pan Side | *d | Right Side |
| 2. INSTALL NO. 1 OIL NOZZLE SUB-ASSEMBLY |
![]() |
Align the pin of the No. 1 oil nozzle with the pin hole of the cylinder block.
Install the 4 No. 1 oil nozzles with the 4 check valves.
| 3. INSTALL PISTON WITH PIN SUB-ASSEMBLY |
![]() |
Using a small screwdriver, install a new snap ring on one side of the piston pin hole.
Gradually heat the piston to approximately 80°C (176°F).
Coat the piston pin with engine oil.
![]() |
Align the front marks of the piston and connecting rod, connect the connecting rod to the piston, and then push in the piston pin with your thumb.
| *1 | Front Mark (Arrow) |
| *2 | Front Mark (Protrusion) |
Check the fit between the piston and piston pin. Try to move the piston back and forth on the piston pin.
![]() |
Using a small screwdriver, install a new snap ring on the other side of the piston pin hole.
| 4. INSTALL PISTON RING SET |
![]() |
Install the coil and oil ring by hand.
| *1 | Coil Joint |
| *2 | Oil Ring End Gap |
![]() |
Using a piston ring expander, install the No. 1 and No. 2 piston rings with the code marks facing upward.
| Item | Specified Condition | |
| No. 1 Piston Ring | w/ EGR System without EGR Cooler | NAC |
| w/ EGR system without EGR Cooler | NKD | |
| w/o EGR System | NAB | |
| No. 2 Piston Ring | w/ EGR Cooler | KD1 |
| w/o EGR Cooler | N | |
| *1 | No. 1 Piston Ring |
| *2 | No. 2 Piston Ring |
![]() |
Position the piston rings so that the ring ends are as shown in the illustration.
| *1 | No. 1 Piston Ring |
| *2 | Oil Ring |
| *3 | Coil |
| *4 | No. 2 Piston Ring |
| *5 | Front Mark (Arrow) |
| 5. INSTALL CRANKSHAFT BEARING |
![]() |
Align the bearing claw with the claw groove of the cylinder block and push in the 5 upper bearings.
![]() |
Align the bearing claw with the claw groove of the crankshaft bearing cap and push in the 5 lower bearings.
| 6. INSTALL CRANKSHAFT |
![]() |
Place the crankshaft on the cylinder block.
Push the crankshaft in one direction and install one thrust washer to the No. 5 journal position with the oil groove facing outward.
Push the crankshaft in the opposite direction and install the other thrust washer to the No. 5 journal position with the oil groove facing outward.
![]() |
Install the 2 thrust washers to the No. 5 bearing cap with the grooves facing outward.
![]() |
Install the 5 crankshaft bearing caps to their proper locations.
![]() |
Install the crankshaft bearing cap bolts.
Apply a light coat of engine oil to the threads and under the bolt heads of the crankshaft bearing cap bolts.
Install and uniformly tighten the 10 bolts of the crankshaft bearing caps in several passes in the sequence shown in the illustration.
![]() |
Mark the front of each crankshaft bearing cap bolt with paint.
| *1 | Painted Mark |
| *a | Front |
Tighten the crankshaft bearing cap bolts by 90° in the numerical order shown in the previous illustration.
Check that the painted marks are now at a 90° angle to the front.
Check that the crankshaft turns smoothly.
Check the crankshaft thrust clearance.
| 7. INSTALL CONNECTING ROD BEARING |
![]() |
Align the bearing claw with the groove of the connecting rod or connecting rod cap.
Install the bearings to the connecting rod and connecting rod cap.
| 8. INSPECT CRANKSHAFT THRUST CLEARANCE |
![]() |
Using a dial indicator, measure the thrust clearance while prying the crankshaft back and forth with a screwdriver.
| Item | Specified Condition |
| STD | 2.430 to 2.480 mm (0.0957 to 0.0976 in.) |
| O/S 0.125 | 2.555 to 2.605 mm (0.1006 to 0.1026 in.) |
| O/S 0.250 | 2.680 to 2.730 mm (0.1055 to 0.1074 in.) |
| 9. INSTALL PISTON AND CONNECTING ROD |
Apply engine oil to the cylinder walls, the pistons and the surfaces of the connecting rod bearings.
Check the positions of the piston ring ends.
![]() |
Using a piston ring compressor, push the correctly numbered piston and connecting rod assembly into the cylinder with the front mark of the piston facing forward.
| *1 | Front Mark (Arrow) |
![]() |
Place the connecting rod cap on the connecting rod.
Match each numbered connecting rod cap with the correct connecting rod.
Align the pins of the connecting rod cap with the pin holes of the connecting rod and install the connecting rod cap.
![]() |
Check that the front mark of the connecting rod cap is facing forward.
| *1 | Front Mark (Protrusion) |
![]() | Front |
![]() |
Install the connecting rod cap bolts.
Apply a light coat of engine oil to the threads and under the heads of the connecting rod cap bolts.
Install and alternately tighten the bolts of the connecting rod cap in several passes.
![]() |
Mark the front of each connecting rod cap bolt with paint.
| *1 | Painted Mark |
| *a | Front |
Tighten the connecting rod cap bolts by 90° as shown in the illustration.
Check that the painted marks are now at a 90° angle to the front.
Check that the crankshaft turns smoothly.
| 10. INSPECT CONNECTING ROD THRUST CLEARANCE |
![]() |
Using a dial indicator, measure the thrust clearance while moving the connecting rod back and forth.
| 11. INSTALL CYLINDER BLOCK OIL ORIFICE |
| 12. INSTALL REAR CRANKSHAFT OIL SEAL |
![]() |
Using SST and a hammer, tap in a new oil seal until its surface is flush with the rear engine oil seal retainer edge.
Apply MP grease to the lip of the oil seal.
| 13. INSTALL SUPPLY PUMP OIL SEAL |
![]() |
Using SST and a hammer, tap in a new oil seal until its surface is flush with the timing gear cover edge.
Apply MP grease to the lip of the oil seal.
| 14. INSTALL FRONT CRANKSHAFT OIL SEAL |
![]() |
Using SST and a hammer, tap in a new oil seal until its surface is flush with the timing gear cover edge.
Apply MP grease to the lip of the oil seal.
| 15. INSTALL REAR ENGINE OIL SEAL RETAINER |
Remove any old seal packing (FIPG material) from the oil pan and cylinder block.
![]() |
Apply seal packing to the places shown in the illustration.
| *1 | Seal Packing |
Install the rear engine oil seal retainer with the 5 bolts. Alternately tighten the 5 bolts in several passes.
| 16. INSTALL NO. 2 BALANCESHAFT DRIVEN GEAR |
Mount the balanceshaft between aluminum plates in a vise.
Align the balanceshaft knock pin with the knock pin hole. Then install the balanceshaft thrust washer and balanceshaft driven gear.
Install the bolt.
| 17. INSTALL NO. 2 BALANCESHAFT SUB-ASSEMBLY |
Install the balanceshaft with the 2 bolts.
| 18. INSTALL NO. 1 BALANCESHAFT DRIVEN GEAR |
Mount the balanceshaft between aluminum plates in a vise.
Align the balanceshaft knock pin with the knock pin hole. Then install the balanceshaft thrust washer and balanceshaft driven gear.
Install the bolt.
| 19. INSTALL NO. 1 BALANCESHAFT SUB-ASSEMBLY |
Install the balanceshaft with the 2 bolts.
| 20. INSTALL TIMING GEAR CASE ASSEMBLY |
![]() |
Install 2 new O-rings to the cylinder block.
| *1 | New O-Ring |
![]() |
Install a new gasket to the groove of the timing gear case.
| *1 | New Gasket |
Remove any old seal packing (FIPG material).
![]() |
Apply seal packing to the timing gear case as shown in the illustration.
| *1 | Seal Packing |
![]() |
Align the "2" marks of the No. 1 balanceshaft driven gear and oil pump drive gear.
Install the timing gear case with the union bolt and 8 bolts.
| 21. INSTALL OIL STRAINER SUB-ASSEMBLY |
Install a new gasket and the oil strainer with the 2 bolts and 2 nuts.
| 22. INSTALL OIL PAN SUB-ASSEMBLY |
![]() |
Remove any old seal packing (FIPG material).
Apply seal packing to the oil pan as shown in the illustration.
Install the oil pan with the 22 bolts and 2 nuts.
| 23. INSTALL INJECTION GEAR |
Install a new O-ring and the fuel supply pump with the 2 nuts.
Temporarily install the injection gear with the nut.
![]() |
Align the "3" marks of the No. 2 balanceshaft driven gear and injection gear.
![]() |
Install a new O-ring to the injection gear.
| *1 | New O-Ring |
![]() |
Install the injection gear set nut.
Using SST, tighten the set nut.
| 24. INSTALL CRANKSHAFT TIMING GEAR |
![]() |
Position the crankshaft timing gear with the "1" timing marks facing forward.
Align the key groove of the crankshaft timing gear with the set key on the crankshaft.
Using SST and a hammer, tap on the timing gear to install it.
| 25. INSTALL NO. 1 IDLE GEAR SHAFT |
![]() |
Apply a coat of engine oil to the No. 1 idle gear shaft.
| *1 | Engine Oil |
![]() |
Install the gear shaft as shown in the illustration.
| *1 | Oil Hole |
| 26. INSTALL NO. 2 IDLE SUB GEAR |
![]() |
Mount the No. 1 idle gear in a vise.
| *1 | Cutout Mark |
![]() |
Install the idle gear spring.
| *1 | Wave Washer |
| *2 | No. 2 Idle Sub Gear |
| *3 | Idle Gear Spring |
Install the No. 2 idle sub gear.
Install the wave washer.
Using snap ring pliers, install the shaft snap ring.
![]() |
Using SST, align the holes of the No. 1 idle gear and No. 2 idle sub gear by turning the No. 2 idle sub gear clockwise, and install a service bolt.
| *1 | Service Bolt |
Remove the No. 1 idle gear from the vise and turn it upside down.
| 27. INSTALL NO. 1 IDLE SUB GEAR |
![]() |
Mount the No. 1 idle gear and No. 2 idle sub gear in a vise.
| *a | Upward |
![]() |
Remove the service bolt.
| *1 | Service Bolt |
![]() |
Install the idle gear spring.
| *1 | Wave Washer |
| *2 | No. 1 Idle Sub Gear |
| *3 | Idle Gear Spring |
Install the No. 1 idle sub gear.
Install the wave washer.
Using snap ring pliers, install the shaft snap ring.
![]() |
Using SST, align the holes of the No. 1 idle gear and No. 1 idle sub gear by turning the No. 1 idle sub gear clockwise, and install a service bolt.
| *1 | Service Bolt |
| *a | Upward |
| 28. INSTALL NO. 1 IDLE GEAR |
![]() |
Align the "4" and "5" timing marks of the idle gear and crankshaft timing gear.
| *a | Turn |
Using SST, turn the injection gear and align the "4" timing marks of the idle gear and injection gear, and then mesh the gears.
![]() |
Position the idle gear thrust plate with the protrusion facing forward.
| *1 | Service Bolt |
Align the bolt holes and install the idle gear thrust plate with the 2 bolts.
Remove the service bolt.
| 29. INSTALL NO. 1 CRANKSHAFT POSITION SENSOR PLATE |
Align the key groove of the No. 1 crankshaft position sensor plate with the set key.
Install the No. 1 crankshaft position sensor plate with the cupped side facing outward.
| 30. INSTALL TIMING GEAR COVER |
Remove any old seal packing (FIPG material).
![]() |
Apply seal packing to the timing gear cover as shown in the illustration.
| *1 | Seal Packing |
Install a new O-ring to the timing gear case.
Install the timing gear cover with the 14 bolts and 2 nuts.
![]() |
Remove the screw plug and gasket.
Pour approximately 50 cc (3.05 cu. in.) of engine oil into the oil pump.
Install a new gasket and the screw plug.
Install the No. 1 vacuum transmitting pipe with the bolt.
| 31. INSTALL ENGINE WATER PUMP ASSEMBLY |
Install a new gasket and the engine water pump with the 5 bolts and 2 nuts.
| 32. INSTALL CYLINDER HEAD GASKET |
![]() |
Find where the piston head protrudes most by slowly turning the crankshaft clockwise and counterclockwise.
| *1 | Measuring Tip |
| *2 | Protrusion |
![]() |
Measure the piston protrusion of each cylinder at 2 points as shown in the illustration.
| *1 | Measuring Point |
For the piston protrusion value of each cylinder, use the average of the 2 measurements of each cylinder.
![]() |
Select a new cylinder head gasket.
| *1 | Cutout Mark |
![]() | Front |
| Mark | Specified Condition |
| A | 0.80 to 0.90 mm (0.0315 to 0.0354 in.) |
| B | 0.85 to 0.95 mm (0.0335 to 0.0374 in.) |
| C | 0.90 to 1.00 mm (0.0354 to 0.0394 in.) |
| D | 0.95 to 1.05 mm (0.0374 to 0.0413 in.) |
| E | 1.00 to 1.10 mm (0.0394 to 0.0433 in.) |
Select the largest piston protrusion value from the measurements made. Then select a new gasket according to the table below.
| Item | Specified Condition | ||||
| Piston protrusion | 0.005 to 0.054 mm (0.000197 to 0.00213 in.) | 0.055 to 0.104 mm (0.00217 to 0.00409 in.) | 0.105 to 0.154 mm (0.00413 to 0.00606 in.) | 0.155 to 0.204 mm (0.00610 to 0.00803 in.) | 0.205 to 0.255 mm (0.00807 to 0.0100 in.) |
| Gasket to be used | A | B | C | D | E |
![]() |
Place the cylinder head gasket on the cylinder block.
![]() | Front |
| 33. INSTALL CYLINDER HEAD SUB-ASSEMBLY |
Place the cylinder head on the cylinder head gasket.
Apply a light coat of engine oil to the threads and under the heads of the cylinder head bolts.
![]() |
Install the 18 washers with the 18 cylinder head bolts, and uniformly tighten the bolts in several passes in the sequence shown in the illustration.
| Item | Specified Condition |
| A | 110 mm (4.33 in.) |
| B | 167 mm (6.57 in.) |
![]() |
Mark the front of each cylinder head bolt with paint.
| *1 | Painted Mark |
| *a | Front |
Further tighten the cylinder head bolts by 90° in the sequence shown in the illustration.
Tighten the cylinder head bolts by an additional 90°.
Check that the painted marks are now facing rearward.
| 34. INSTALL VALVE LIFTER |
Install the valve lifters.
Check that each valve lifter rotates smoothly by hand.
| 35. INSTALL CAMSHAFT |
![]() |
Using the crankshaft pulley bolt, set the No. 1 cylinder to 90° BTDC/compression.
| *1 | Key |
Install the camshaft.
Apply engine oil to the thrust portion of the camshaft.
![]() |
Place the camshaft on the cylinder head with the key groove facing upward.
| *1 | Key Groove |
| *a | Upward |
![]() |
Align the timing marks (1-dot marks) of the camshaft drive and driven main gears and set the No. 2 camshaft in place.
Remove any old seal packing (FIPG material) from the camshaft bearing cap.
![]() |
Apply seal packing to the specified areas shown in the illustration.
| *1 | Seal Packing |
| *2 | Oil Passage |
![]() |
Install the 5 bearing caps to their proper locations.
![]() |
Apply a light coat of engine oil to the threads and under the heads of the bearing cap bolts.
Install and uniformly tighten the 15 bearing cap bolts in several passes in the sequence shown in the illustration.
Install a new camshaft oil seal.
Apply MP grease to the lip of a new oil seal.
![]() |
Using SST and a hammer, tap in the oil seal until its surface is flush with the surfaces of the camshaft bearing cap and cylinder head.
| 36. INSTALL CYLINDER BLOCK INSULATOR |
Install the cylinder block insulator to the cylinder head.
| 37. INSTALL NO. 2 TIMING BELT COVER |
![]() |
Apply seal packing (FIPG) to the specified areas shown in the illustration.
| *1 | Seal Packing |
Clean the bolts and their holes.
Apply adhesive to 2 or 3 threads at the end of each of the 4 bolts.
Install the No. 2 timing belt cover with the 4 bolts and nut.
| 38. INSTALL CAMSHAFT TIMING PULLEY |
Install the camshaft timing pulley.
Install the bolt of the camshaft timing pulley while holding the camshaft with a wrench.
| 39. INSPECT AND ADJUST VALVE CLEARANCE |
| 40. INSTALL INJECTOR ASSEMBLY (w/ Glow Plug Controller) |
![]() |
Install 4 new injection nozzle seats to the cylinder head.
Apply a small amount of clean engine oil to 4 new O-rings.
![]() |
Install one of the O-rings to each injector as shown in the illustration.
| *1 | New O-Ring |
Insert the 4 injectors into the cylinder head.
![]() |
Temporarily install 4 new washers and the 4 No. 1 nozzle holder clamps with the 4 bolts.
| *1 | New Washer |
| *a | Downward |
![]() |
| *1 | No. 1 Nozzle Holder Clamp |
Temporarily install the 4 injection pipes with the union nuts.
![]() |
Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
If scratches or dents are present, replace the nozzle leakage pipe.
![]() |
Set the nozzle leakage pipe and 5 new gaskets in place.
| *1 | Union Bolt |
| *2 | Injector Hollow Screw |
| *3 | New Gasket |
Apply a small amount of oil to the 4 injector hollow screws and union bolt.
Temporarily install the nozzle leakage pipe with the 4 injector hollow screws and union bolt.
Tighten the 4 nozzle holder clamp bolts.
Remove the 4 injection pipes.
![]() |
Tighten the 4 injector hollow screws in order from 1 to 4.
| *1 | Union Bolt |
Tighten the union bolt.
| 41. INSTALL INJECTOR ASSEMBLY (w/o Glow Plug Controller) |
![]() |
Install 4 new injection nozzle seats to the cylinder head.
Apply a small amount of clean engine oil to 4 new O-rings.
![]() |
Install an O-ring to each injector as shown in the illustration.
Insert the 4 injectors into the cylinder head.
For an injector that has been replaced with a new injector, register the injector compensation code.
![]() |
Temporarily install 4 new washers and the 4 No. 1 nozzle holder clamps with the 4 bolts.
![]() |
Temporarily install the 4 injection pipes with the union nuts.
![]() |
Check the nozzle leakage pipe. Check that there are no scratches or dents on the 5 union seal surfaces.
If scratches or dents are present, replace the nozzle leakage pipe.
![]() |
Set the leakage pipe and 5 new gaskets in place.
Apply a small amount of oil to the 4 injector hollow screws and union bolt.
Temporarily install the nozzle leakage pipe with the 4 injector hollow screws and union bolt.
Tighten the 4 holder clamp bolts.
Remove the 4 injection pipes.
![]() |
Tighten the 4 injector hollow screws in order from 1 to 4.
Tighten the union bolt.
| 42. INSPECT FOR FUEL LEAK |
Perform the Active Test.
Connect the intelligent tester to the DLC3.
Turn the ignition switch to ON.
Turn the intelligent tester on.
Enter the following menus: Powertrain / Engine / Active Test.
Perform the Active Test.
| Intelligent Tester Display | Test Part | Control Range | Diagnostic Note |
| Test the Fuel Leak | Pressurize common rail interior and check for fuel leaks | Stop/Start |
|
| 43. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY |
![]() |
Install 4 new No. 3 cylinder head cover gaskets to the cylinder head cover in the directions shown in the illustration.
| *1 | No. 3 Cylinder Head Cover Gasket |
| *2 | Cylinder Head Cover |
Remove any old seal packing (FIPG material) from the cylinder head.
![]() |
Apply seal packing to the areas shown in the illustration.
![]() | Seal Packing |
Install a new cylinder head cover gasket to the cylinder head cover.
![]() |
Temporarily install the cylinder head cover with the 10 bolts and 2 nuts in the order shown in the illustration. Then, tighten the 10 bolts and 2 nuts in the order shown in the illustration in 2 progressive steps.
Connect the ventilation hose.
Install 4 new nozzle holder seals.
| 44. INSTALL OIL FILLER CAP SUB-ASSEMBLY |