DTC P2009 Intake Manifold Runner Control Circuit Low (Bank 1) |
DTC P2010 Intake Manifold Runner Control Circuit High (Bank 1) |
| DTC Detection Drive Pattern | DTC Detection Condition | Trouble Area |
| 2 seconds after engine is started, race engine for 1 second | Open in No. 1 vacuum switching valve (for swirl control valve) circuit for 0.5 seconds (2 trip detection logic). |
|
| DTC Detection Drive Pattern | DTC Detection Condition | Trouble Area |
| 2 seconds after engine is started, race engine for 1 second | Short in No. 1 vacuum switching valve (for swirl control valve) circuit for 0.5 seconds (2 trip detection logic). |
|
| 1.PERFORM ACTIVE TEST USING GTS (ACTIVATE THE VSV FOR SWIRL CONTROL VALVE) |
![]() |
Connect the GTS to the DLC3.
Disconnect the vacuum hoses from the No. 1 vacuum switching valve (for swirl control valve).
Turn the ignition switch to ON and turn the GTS on.
Enter the following menus: Powertrain / Engine / Active Test / Activate the VSV for Swirl Control Valve.
Check the VSV operation when it is operated using the GTS.
| Tester Operation | Specified Condition |
| VSV ON | Air from port E flows out through port F |
| VSV OFF | Air from port E flows out through air filter |
Reconnect the vacuum hoses.
|
| ||||
| OK | ||
| ||
| 2.INSPECT NO. 1 VACUUM SWITCHING VALVE FOR SWIRL CONTROL VALVE (RESISTANCE) |
Inspect the No. 1 vacuum switching valve (for swirl control valve) .
|
| ||||
| OK | |
| 3.INSPECT NO. 1 VACUUM SWITCHING VALVE (FOR SWIRL CONTROL VALVE) (POWER SOURCE VOLTAGE) |
![]() |
Disconnect the No. 1 vacuum switching valve (for swirl control valve) connector.
Measure the voltage according to the value(s) in the table below.
| Tester Connection | Switch Condition | Specified Condition |
| S35-2 - Body ground | Ignition switch ON | 11 to 14 V |
| *a | Front view of wire harness connector (to Vacuum Switching Valve (for No. 1 Swirl Control Valve)) |
Reconnect the No. 1 vacuum switching valve (for swirl control valve) connector.
|
| ||||
| OK | |
| 4.CHECK HARNESS AND CONNECTOR (NO. 1 VACUUM SWITCHING VALVE (FOR SWIRL CONTROL VALVE) - ECM) |
Disconnect the No. 1 vacuum switching valve (for swirl control valve) connector.
Disconnect the ECM connector.
Measure the resistance of the wire harness side connectors.
| Tester Connection | Condition | Specified Condition |
| S35-1 - E28-7 (SCV) | Always | Below 1 Ω |
| S35-1 or E28-7 (SCV) - Body ground | Always | 10 kΩ or higher |
Reconnect the No. 1 vacuum switching valve (for swirl control valve) connector.
Reconnect the ECM connector.
|
| ||||
| OK | |
| 5.REPLACE ECM |
Replace the ECM (Click here).
|
| ||||
| 6.CHECK HARNESS AND CONNECTOR (NO. 1 VACUUM SWITCHING VALVE (FOR SWIRL CONTROL VALVE) - NO. 1 INTEGRATION RELAY) |
Remove the No. 1 integration relay from the engine room relay block and junction block assembly.
Disconnect the No. 1 integration relay connector.
Disconnect the No. 1 vacuum switching valve (for swirl control valve) connector.
Measure the resistance of the wire harness side connectors.
| Tester Connection | Condition | Specified Condition |
| 1J-5 - S35-2 | Always | Below 1 Ω |
| 1J-5 or S35-2 - Body ground | Always | 10 kΩ or higher |
Reinstall the No. 1 integration relay.
Reconnect the No. 1 integration relay connector.
Reconnect the No. 1 vacuum switching valve (for swirl control valve) connector.
|
| ||||
| OK | |
| 7.INSPECT ECM POWER SOURCE CIRCUIT |
Check the ECM power source circuit (Click here).
|
| ||||
| 8.REPLACE VACUUM CONTROL VALVE SET |
Replace the vacuum control valve set .
|
| ||||
| 9.REPAIR OR REPLACE HARNESS OR CONNECTOR |
Repair or replace harness or connector.
| NEXT | |
| 10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED |
Connect the GTS to the DLC3.
Clear the DTCs (Click here).
Start the engine and wait for 3 seconds or more.
2 seconds after the engine is started, race the engine for 1 second.
Enter the following menus: Powertrain / Engine / Trouble Codes.
Confirm that the DTC is not output again.
| NEXT | ||
| ||