Home › Engine / Hybrid System › 1GR-FE STARTING › STARTER
RM33K0E _51 Engine / Hybrid System _043587 1GR-FE STARTING _0227371 STARTER A

1GR-FE STARTING  STARTER  INSTALLATION  


PROCEDURE

Hide 11363A 1.INSTALL FLYWHEEL HOUSING SIDE COVER

a.

Install the flywheel housing side cover to the cylinder block.


Hide 28100 2.INSTALL STARTER ASSEMBLY

a.

Install the starter assembly with the 2 bolts.

Torque:
37 N*m (377 kgf*cm, 27 ft.*lbf)


b.

Connect the wire harness bracket with the bolt.

Torque:
13 N*m (133 kgf*cm, 10 ft.*lbf)


c.

Connect the starter wire with the nut.

Torque:
9.8 N*m (100 kgf*cm, 87 in.*lbf)


d.

Connect the terminal cap.


e.

Connect the starter wire to the cylinder block with the bolt.

Torque:
14 N*m (143 kgf*cm, 10 ft.*lbf)


f.

Connect the starter connector.


Hide 4.CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

NOTICE:

When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

Click hereGeneral>INTRODUCTION>REPAIR INSTRUCTION>INITIALIZATION