Home › Engine / Hybrid System › 1GD-FTV ENGINE CONTROL › ECD SYSTEM
RM3250E _51 Engine / Hybrid System _037972 1GD-FTV ENGINE CONTROL _0189556 ECD SYSTEM C

1GD-FTV ENGINE CONTROL  ECD SYSTEM  P2564  Turbocharger/Supercharger Boost Control Position Sensor "A" Circuit Low  P2565  Turbocharger/Supercharger Boost Control Position Sensor "A" Circuit High  


DESCRIPTION

The variable nozzle vane type turbocharger consists primarily of a compressor wheel, turbine wheel, nozzle vane, unison ring, DC motor and nozzle vane position sensor.

The nozzle vane position sensor consists of a Hall IC and a magnetic yoke that rotates in unison with the movement of the linkage that actuates the nozzle vane. The nozzle vane position sensor converts the changes in the magnetic flux that are caused by the rotation of the DC motor (hence, the rotation of the magnetic yoke) into electric signals, and outputs them to the ECM. The ECM determines the actual nozzle vane position from the electric signals in order to calculate the target nozzle vane position.

A348993E01
1.125,2.385 0.677,1.354 0.677,1.354 0.844,1.354 true 1.271,1.813 1.427,1.198 1.427,1.198 1.573,1.198 true 1.229,3.104 1.49,3.594 1.49,3.594 1.615,3.594 true 0.063,2.74 0.615,3.135 0.552,0.396 10 false Sensor Vane 0.313,3.906 2.604,4.427 2.292,0.521 10 false Nozzle Vane Position Sensor (Turbocharger Nozzle Vane Control Actuator) 1.625,1.135 2.281,1.354 0.656,0.219 10 false Magnet 1.854,1.469 2.344,1.656 0.49,0.188 10 false VNVC 2.844,3.552 3.354,3.75 0.51,0.198 10 false ECM 4.219,1.656 4.688,1.854 0.469,0.198 10 false 4.65 3.531,0.677 5.333,1.094 1.802,0.417 10 false Nozzle Vane Position Sensor Output Voltage (V) 1.906,2.25 2.396,2.438 0.49,0.188 10 false VTA1 1.896,3.021 2.385,3.208 0.49,0.188 10 false VNE2 2.75,1.583 3.24,1.771 0.49,0.188 10 false VNVC 2.75,2.375 3.24,2.563 0.49,0.188 10 false VNA 2.729,3.167 3.219,3.354 0.49,0.188 10 false VNE2 1.656,3.521 2.313,3.74 0.656,0.219 10 false Magnet 0.896,1.281 1.479,1.479 0.583,0.198 10 false Hall IC 4.229,2.823 4.698,3.021 0.469,0.198 10 false 0.35 6.042,3.354 6.74,3.615 0.698,0.26 10 false Open 4.917,3.354 5.531,3.594 0.615,0.24 10 false Closed 5.021,3.76 6.615,4 1.594,0.24 10 false Nozzle Vane Position

DTC No. Detection Item DTC Detection Condition Trouble Area MIL Memory
P2564 Turbocharger/Supercharger Boost Control Position Sensor "A" Circuit Low VNA voltage is 0.1 V or less for 2.1 seconds (1 trip detection logic).
·

Nozzle vane position sensor (turbocharger nozzle vane control actuator)

·

Open or short in nozzle vane position sensor circuit

·

ECM


Comes on DTC stored
P2565 Turbocharger/Supercharger Boost Control Position Sensor "A" Circuit High VNA voltage is 4.9 V or higher for 2.1 seconds (1 trip detection logic).
·

Nozzle vane position sensor (turbocharger nozzle vane control actuator)

·

Open or short in nozzle vane position sensor circuit

·

ECM


Comes on DTC stored

HINT:

If DTC P2564 and/or P2565 is stored due to the nozzle vane being stuck open, the following symptoms may appear:

- Lack of power

- Vehicle surge or hesitation under light or medium load



CONFIRMATION DRIVING PATTERN

DTC No. DTC Detection Drive Pattern
P2564 Ignition switch ON for 2 seconds or more
P2565

WIRING DIAGRAM

A348545E03
0.615,2.646 1.073,2.844 0.458,0.198 10 false C93 0.615,2.854 3.406,3.292 2.792,0.438 10 false Nozzle Vane Position Sensor (Turbocharger Nozzle Vane Control Actuator) 5.771,2.625 6.229,2.823 0.458,0.198 10 false C59 5.781,2.802 6.24,3 0.458,0.198 10 false ECM 5.458,1.833 5.917,2.031 0.458,0.198 10 false VNE2 5.448,1.375 5.906,1.573 0.458,0.198 10 false VNA 5.448,0.896 5.969,1.094 0.521,0.198 10 false VNVC 5.188,1.125 5.646,1.323 0.458,0.198 10 false 30 5.198,1.604 5.656,1.802 0.458,0.198 10 false 23 5.198,2.063 5.656,2.26 0.458,0.198 10 false 22 1.677,1.021 2.198,1.219 0.521,0.198 10 false VNVC 1.708,1.49 2.167,1.688 0.458,0.198 10 false VTA1 1.688,1.948 2.146,2.146 0.458,0.198 10 false VNE2 2.177,1.146 2.635,1.344 0.458,0.198 10 false 1 2.188,1.625 2.646,1.823 0.458,0.198 10 false 3 2.188,2.063 2.646,2.26 0.458,0.198 10 false 2

CAUTION / NOTICE / HINT

NOTICE:

After replacing the ECM, the new ECM needs registration (Click here Engine / Hybrid System>1GD-FTV ENGINE CONTROL>ECD SYSTEM>REGISTRATION) and initialization (Click here Engine / Hybrid System>1GD-FTV ENGINE CONTROL>ECD SYSTEM>INITIALIZATION).


HINT:

Read freeze frame data using the GTS. Freeze frame data records the engine condition when malfunctions are detected. When troubleshooting, freeze frame data can help determine if the vehicle was moving or stationary, if the engine was warmed up or not, and other data from the time the malfunction occurred.


PROCEDURE

1.CHECK TERMINAL VOLTAGE (POWER SOURCE OF NOZZLE VANE POSITION SENSOR)
a.
C129053C31
0.583,1 1.021,1.271 0.438,0.271 1.49,1.24 1.292,1.552 true 1.771,1.24 1.906,1.552 true 0.677,1.052 1,1.24 0.323,0.188 10 false C93 0.938,1.573 1.458,1.75 0.521,0.177 10 false VNVC 0.094,0.063 0.313,0.219 0.219,0.156 10 false *a 1.917,1.583 2.552,1.813 0.635,0.229 10 false VNE2
*a Front view of wire harness connector
(to Nozzle Vane Position Sensor)


Disconnect the nozzle vane position sensor connector.


b.

Turn the ignition switch to ON.


c.

Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Condition Specified Condition
C93-1 (VNVC) - C93-2 (VNE2) Ignition switch ON 4.5 to 5.5 V



d.

Reconnect the nozzle vane position sensor connector.


Result:
Proceed to
OK
NG



OK

2.INSPECT NOZZLE VANE POSITION SENSOR (VNA VOLTAGE)

NG

7.CHECK ECM (POWER SOURCE OF NOZZLE VANE POSITION SENSOR)
2.INSPECT NOZZLE VANE POSITION SENSOR (VNA VOLTAGE)
a.
A257437C92
1.25,0.865 1.656,1.104 0.406,0.24 1.25,2.281 1.448,1.646 true 1.823,2.292 1.49,1.656 true 0.146,0.146 0.458,0.344 0.313,0.198 10 false *a 1.333,0.917 1.792,1.188 0.458,0.271 10 false C59 0.771,2.302 1.635,2.531 0.865,0.229 10 false 23 (VNA) 1.833,2.302 2.76,2.531 0.927,0.229 10 false 22 (VNE2)
*a Component with harness connected
(ECM)


Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Switch Condition Specified Condition
C59-23 (VNA) - C59-22 (VNE2) Ignition switch ON 2.3 to 2.7 V



Result:
Proceed to
OK
NG



OK

9.REPLACE ECM

NG

3.CHECK HARNESS AND CONNECTOR (ECM - NOZZLE VANE POSITION SENSOR)
3.CHECK HARNESS AND CONNECTOR (ECM - NOZZLE VANE POSITION SENSOR)
a.

Disconnect the nozzle vane position sensor connector.


b.

Disconnect the ECM connector.


c.

Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Condition Specified Condition
C93-3 (VTA1) - C59-23 (VNA) Always Below 1 Ω
C93-2 (VNE2) - C59-22 (VNE2) Always Below 1 Ω
C93-3 (VTA1) or C59-23 (VNA) - Body ground and other terminals Always 10 kΩ or higher
C93-2 (VNE2) or C59-22 (VNE2) - Body ground and other terminals Always 10 kΩ or higher



d.

Reconnect the nozzle vane position sensor connector.


e.

Reconnect the ECM connector.


Result:
Proceed to
OK
NG



OK

4.CHECK ECM (CHECK RESISTANCE)

NG

6.REPAIR OR REPLACE HARNESS OR CONNECTOR
4.CHECK ECM (CHECK RESISTANCE)
a.

Disconnect the nozzle vane position sensor connector.


b.
C129053C32
0.583,1 1.021,1.271 0.438,0.271 1.49,1.24 1.24,1.74 true 1.719,1.26 1.74,1.698 true 2.01,1.271 2.313,1.75 true 0.677,1.052 1.104,1.271 0.427,0.219 10 false C93 0.833,1.75 1.354,1.927 0.521,0.177 10 false VNVC 0.094,0.063 0.313,0.219 0.219,0.156 10 false *a 1.583,1.74 2.219,1.969 0.635,0.229 10 false VNE2 2.219,1.76 2.854,1.99 0.635,0.229 10 false VTA1
*a Front view of wire harness connector
(to Nozzle Vane Position Sensor)


Measure the resistance according to the value(s) in the table below.

Standard Resistance:
Tester Connection Switch Condition Specified Condition
C93-1 (VNVC) - C93-3 (VTA1) Ignition switch off No short or open circuit
C93-3 (VTA1) - C93-2 (VNE2)



c.

Reconnect the nozzle vane position sensor connector.


Result:
Proceed to
OK
NG



OK

5.REPLACE TURBOCHARGER NOZZLE VANE CONTROL ACTUATOR (NOZZLE VANE POSITION SENSOR)

NG

9.REPLACE ECM
5.REPLACE TURBOCHARGER NOZZLE VANE CONTROL ACTUATOR (NOZZLE VANE POSITION SENSOR)
a.

Replace the turbocharger nozzle vane control actuator.

Click hereEngine / Hybrid System>1GD-FTV INTAKE / EXHAUST>EXHAUST MANIFOLD W/ TURBOCHARGER>DISASSEMBLY


Result:
Proceed to
NEXT



NEXT

10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
6.REPAIR OR REPLACE HARNESS OR CONNECTOR
a.

Repair or replace the harness or connector.


Result:
Proceed to
NEXT



NEXT

10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
7.CHECK ECM (POWER SOURCE OF NOZZLE VANE POSITION SENSOR)
a.
A257437C93
1.26,0.854 1.656,1.104 0.396,0.25 1.104,2.365 1.448,1.698 true 1.938,2.344 1.49,1.646 true 0.146,0.146 0.458,0.344 0.313,0.198 10 false *a 1.323,0.906 1.698,1.115 0.375,0.208 10 false C59 1.865,2.375 2.708,2.594 0.844,0.219 10 false 22 (VNE2) 0.635,2.375 1.417,2.594 0.781,0.219 10 false 30 (VNVC)
*a Component with harness connected
(ECM)


Measure the voltage according to the value(s) in the table below.

Standard Voltage:
Tester Connection Switch Condition Specified Condition
C59-30 (VNVC) - C59-22 (VNE2) Ignition switch ON 4.5 to 5.5 V



Result:
Proceed to
OK
NG



OK

8.REPAIR OR REPLACE HARNESS OR CONNECTOR

NG

9.REPLACE ECM
8.REPAIR OR REPLACE HARNESS OR CONNECTOR
a.

Repair or replace the harness or connector.


Result:
Proceed to
NEXT



NEXT

10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
9.REPLACE ECM

Result:
Proceed to
NEXT



NEXT

10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
10.CONFIRM WHETHER MALFUNCTION HAS BEEN SUCCESSFULLY REPAIRED
a.

Connect the GTS to the DLC3.


b.

Clear the DTCs.

Powertrain > Engine and ECT > Clear DTCs
50002 234

c.

Turn the ignition switch off.


d.

Turn the ignition switch off and leave the vehicle for 15 seconds.


e.

Turn the ignition switch to ON for 1 second.


f.

Confirm that the DTC is not output again.

HINT:

Perform the following procedure using the GTS to determine whether or not the DTC judgment has been carried out.


i.

Enter the following menus: Powertrain / Engine and ECT / Utility / All Readiness.

Powertrain > Engine and ECT > Utility
Tester Display
All Readiness
50005 234 20

ii.

Input DTC P2564 and/or P2565.


iii.

Check that STATUS is NORMAL. If STATUS is INCOMPLETE or N/A, idle the engine.



Result:
Proceed to
NEXT



NEXT

END