Home › Engine / Hybrid System › 2GD-FTV EMISSION CONTROL › UREA PUMP CONTROL ECU › from 2016.03
RM3250E _51 Engine / Hybrid System _038008 2GD-FTV EMISSION CONTROL _0262568 UREA PUMP CONTROL ECU A

2GD-FTV EMISSION CONTROL  UREA PUMP CONTROL ECU  INSTALLATION  


PROCEDURE

Hide 896B1 1.INSTALL UREA PUMP CONTROL ECU

a.

Install the urea pump control ECU to the No. 1 urea pump control bracket with the 2 bolts.

Torque:
3.0 N*m (31 kgf*cm, 27 in.*lbf)


b.

Temporarily install the No. 1 urea pump control bracket to the urea tank sub-assembly with the 3 nuts.


c.
A379867N01
2.854,1.24 3,1.427 0.146,0.188 10 true 1 0.333,1.344 0.479,1.531 0.146,0.188 10 true 2 2.656,0.385 2.802,0.573 0.146,0.188 10 true 3

Tighten the 3 nuts in the order shown in the illustration.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


d.
A379866

Connect the connector to the urea pump control ECU.

NOTICE:

When connecting a connector, make sure that dirt, water and other foreign matter is not stuck between the connector and urea pump control ECU.



Hide 89678A 2.INSTALL NO. 2 UREA PUMP CONTROL BRACKET

a.

Temporarily install the No. 2 urea pump control bracket to the No. 1 urea pump control bracket with the 2 nuts.


b.
A379865N01
2.76,0.542 2.875,0.708 0.115,0.167 10 true 1 0.229,0.24 0.344,0.406 0.115,0.167 10 true 2

Tighten the 2 nuts in the order shown in the illustration.

Torque:
8.0 N*m (82 kgf*cm, 71 in.*lbf)


Hide 77801A 3.INSTALL UREA TANK SUB-ASSEMBLY