Home › Engine / Hybrid System › 5L-E INTAKE / EXHAUST › EXHAUST MANIFOLD › from 2016.01
RM3270E _51 Engine / Hybrid System _048878 5L-E INTAKE / EXHAUST _0232302 EXHAUST MANIFOLD A

5L-E INTAKE / EXHAUST  EXHAUST MANIFOLD  INSTALLATION  


PROCEDURE

Hide 17141 1.INSTALL EXHAUST MANIFOLD

a.
A362745C01
0,0 0,0 false
V100135

Front Mark


Install a new gasket to the cylinder head sub-assembly.

HINT:

Be sure to install a new gasket in the correct direction as shown in the illustration.



b.
A375699C01
0,0 0,0 false
V100135

Bolt
V100136

Nut


Install the exhaust manifold with the 6 bolts and 2 new nuts. Uniformly tighten the bolts and nuts in several steps.

Torque:
52 N*m (530 kgf*cm, 38 ft.*lbf)


Hide 17167 2.INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR

a.
A362743N01
0.406,0.302 0.563,0.5 0.156,0.198 10 true A 2.448,0.781 2.604,0.979 0.156,0.198 10 true A 1.698,1.979 1.854,2.177 0.156,0.198 10 true B

Install the No. 1 exhaust manifold heat insulator with the 3 bolts.

Torque:
for bolt A : 18 N*m (184 kgf*cm, 13 ft.*lbf)
for bolt B : 19 N*m (194 kgf*cm, 14 ft.*lbf)


Hide 88431 3.INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET

Hide 88320 4.CONNECT COOLER COMPRESSOR ASSEMBLY

Hide 16361A 5.INSTALL FAN AND GENERATOR V BELT

Hide 88320 6.INSTALL COOLER COMPRESSOR V BELT

Hide 44310A 7.INSTALL VANE PUMP V BELT

Hide 17410 8.INSTALL FRONT EXHAUST PIPE ASSEMBLY

Hide 17700 9.INSTALL AIR CLEANER CASE ASSEMBLY

Hide 17801 10.INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY

Hide 17705 11.INSTALL AIR CLEANER CAP AND HOSE