Home › Engine / Hybrid System › 5L-E ENGINE CONTROL › ECD SYSTEM › from 2016.01
RM3270E _51 Engine / Hybrid System _048946 5L-E ENGINE CONTROL _0236357 ECD SYSTEM C

5L-E ENGINE CONTROL  ECD SYSTEM  P1225  Spill Control Circuit  


DESCRIPTION

The ECM controls the fuel injection volume by operating the spill control valve. The spill control valve is mounted on the injection or supply pump assembly, and opens or closes the injection pressure releasing port with the solenoid valve in the spill control valve. During injection, the valve is closed (ON). The ECM decides the basic fuel injection volume by the engine speed and accelerator pedal opening angle, and calculates the final fuel injection angle to make the various corrections to the basic fuel injection volume. The ECM counts the NE signal to detect the angle from injection starts and operates the spill control valve from ON to OFF (the injection pressure releasing port is open) at the position that detects the final fuel injection angle.

A379161E01
0.344,0.542 1.052,0.74 0.708,0.198 10 false NE Signal 0.854,1.208 1.563,1.406 0.708,0.198 10 false Close (ON) 0.854,1.521 1.708,1.729 0.854,0.208 10 false Close (OFF) 0.052,1.208 0.552,1.823 0.5,0.615 10 false Spill Control Valve 0.625,1.854 1.479,2.063 0.854,0.208 10 false Plunger Lift 2.01,2.51 2.927,2.719 0.917,0.208 10 false Injection start 2.542,1.656 3.656,2.063 1.115,0.406 10 false Final fuel injection angle

DTC No. Detection Item DTC Detection Condition Trouble Area MIL Memory
P1225 Spill Control Circuit Open or short in spill control valve at 500 rpm or more.
·

Open or short in spill control valve circuit

·

Spill control valve (Injection or supply pump assembly)

·

ECM


Comes on DTC stored

WIRING DIAGRAM

A379162E01
2.167,1.854 2.365,2.052 0.198,0.198 10 false 1 1.448,2.469 2.615,2.667 1.167,0.198 10 false Spill Control Valve 1.448,2.292 2.615,2.49 1.167,0.198 10 false C179 5.146,3.094 5.531,3.281 0.385,0.188 10 false ECM 5.146,2.927 5.531,3.115 0.385,0.188 10 false C174 2.156,1.156 2.365,1.354 0.208,0.198 10 false 2 4.563,1.135 4.771,1.333 0.208,0.198 10 false 2 4.563,1.844 4.76,2.042 0.198,0.198 10 false 1 4.563,2.281 4.771,2.479 0.208,0.198 10 false 5 4.76,1.271 5.24,1.458 0.479,0.188 10 false SPV+ 4.76,1.948 5.24,2.135 0.479,0.188 10 false SPV- 4.76,2.406 5.24,2.594 0.479,0.188 10 false E1

CAUTION / NOTICE / HINT

HINT:

Read freeze frame data using the GTS. Freeze frame data records the engine condition when malfunctions are detected. When troubleshooting, freeze frame data can help determine if the vehicle was moving or stationary, if the engine was warmed up or not, and other data from the time the malfunction occurred.


PROCEDURE

1.INSPECT SPILL CONTROL VALVE
a.

Inspect the spill control valve.

Click hereEngine / Hybrid System>5L-E FUEL>FUEL INJECTION PUMP>INSPECTION


Result:
Proceed to
OK
NG



OK

2.CHECK HARNESS AND CONNECTOR (ECM - SPILL CONTROL VALVE)

NG

REPLACE INJECTION PUMP ASSEMBLY

2.CHECK HARNESS AND CONNECTOR (ECM - SPILL CONTROL VALVE)
a.

Disconnect the spill control valve connector.


b.

Disconnect the ECM connector.


c.

Measure the resistance to the value(s) in the table below.

Standard resistance:
Tester Connection Condition Specified Condition
C179-2 - C174-2 (SPV+) Always Below 1 Ω
C179-1 - C174-1 (SPV-) Always Below 1 Ω
C179-2 or C174-2 (SPV+) - Body ground and other terminals Always 10 kΩ or higher
C179-1 or C174-1 (SPV-) - Body ground and other terminals Always 10 kΩ or higher



Result:
Proceed to
OK
NG



OK

NG

REPAIR OR REPLACE HARNESS OR CONNECTOR