1.INSTALL UNIVERSAL JOINT SPIDER ASSEMBLY
Use the same procedure for all universal joint spiders.
Apply MP grease to a new spider and 2 new spider bearings.
Be careful not to apply too much grease.
Fit the spider into the yoke.
Using SST, install the 2 spider bearings to the spider.
Using SST, adjust the spider bearings so that: 1) the yoke does not overlap the snap ring grooves of the spider bearings; 2) the grooves are as wide as possible; and 3) the groove width on both sides is the same.
Install 2 new snap rings to the installed spider bearings. The snap rings must have equal thickness and allow 0 to 0.05 mm (0 to 0.00196 in.) of axial play.
| Part No. | Thickness | Mark |
|---|---|---|
| 90520-T0007 | 2.19 mm (0.0862 in.) | F |
| 90520-T0008 | 2.21 mm (0.0870 in.) | G |
| 90520-T0009 | 2.23 mm (0.0878 in.) | H |
| 90520-T0010 | 2.25 mm (0.0886 in.) | J |
| 90520-T0011 | 2.27 mm (0.0894 in.) | K |
| 90520-T0012 | 2.29 mm (0.0902 in.) | 1 |
| 90520-T0013 | 2.31 mm (0.0909 in.) | 2 |
| 90520-T0014 | 2.33 mm (0.0917 in.) | 3 |
| 90520-T0015 | 2.35 mm (0.0925 in.) | 4 |
| 90520-T0016 | 2.37 mm (0.0933 in.) | 5 |
| 90520-T0017 | 2.39 mm (0.0941 in.) | 6 |
| 90520-T0018 | 2.41 mm (0.0949 in.) | 7 |
| 90520-T0019 | 2.43 mm (0.0957 in.) | 8 |
| 90520-T0020 | 2.45 mm (0.0965 in.) | N |
| 90520-T0021 | 2.47 mm (0.0972 in.) | 10 |
| 90520-T0022 | 2.49 mm (0.0980 in.) | A |
| 90520-T0023 | 2.51 mm (0.0988 in.) | B |
| 90520-T0024 | 2.53 mm (0.0996 in.) | C |
| 90520-T0025 | 2.55 mm (0.1004 in.) | D |
| 90520-T0026 | 2.57 mm (0.1012 in.) | E |
New snap rings must be used.
The snap ring thickness must be the same on both ends.
| *a | Hammering Point |
Using a plastic-faced hammer, tap the yoke until there is no clearance between the spider bearings and snap rings.
Align the matchmarks on the yoke and shaft.
Install new spider bearings on the shaft side.
Use the procedure described above.
2.INSPECT UNIVERSAL JOINT SPIDER ASSEMBLY
3.INSTALL CENTER NO. 1 SUPPORT BEARING ASSEMBLY
| *a | Front Side |
Install the center support bearing to the intermediate shaft.
Coat the splines of the intermediate shaft with MP grease.
| *1 | Matchmark |
Align the matchmarks on the flange coupling and intermediate shaft, and install the flange coupling to the intermediate shaft.
Install the washer.
Using SST to hold the flange coupling, press the bearing into position by installing a new lock nut.
Loosen the lock nut.
Tighten the lock nut again.
Using a chisel and hammer, stake the lock nut.
Completely remove any oil or the like and clean the contact surfaces of the propeller shaft flange and flange coupling.
| *1 | Matchmark |
Align the matchmarks on the flange yoke and flange coupling, and connect them with the 4 washers and 4 nuts.
If any parts with matchmarks are replaced during inspection, reassemble them so that the yoke of the intermediate shaft and the rear flange yoke of the propeller shaft are at right angles to each other.
4.INSPECT PROPELLER SHAFT GREASE FITTING DIRECTION
When replacing a spider bearing, be sure that the grease fitting hole is facing the direction shown in the illustration.
Fill the grease fittings with MP grease.
| *1 | No. 1 Grease Fitting | *2 | No. 2 Grease Fitting |
| *3 | No. 3 Grease Fitting | - | - |
| *a | Spider grease fitting assembly direction for propeller shaft assembly | *b | Rear Side |