1.ADJUST COMPRESSOR OIL
When replacing the compressor and magnet clutch with a new one, gradually discharge the refrigerant gas from the service valve, and drain the following amount of oil from the new compressor and magnet clutch before installation.
(Oil capacity inside the new compressor and magnet clutch: 180 + 15 cc (6.08 + 0.51 fl.oz)) - (Remaining oil amount in the removed compressor and magnet clutch) = (Oil amount to be removed from the new compressor)
When checking the compressor oil level, follow the A/C system precautions.
If a new compressor and magnet clutch is installed without removing the oil remaining in the pipes of the vehicle, the oil amount will be too large. This prevents heat exchange in the refrigerant cycle and causes refrigerant failure.
If the volume of oil remaining in the removed compressor and magnet clutch is small, check for oil leakage.
Be sure to use ND-OIL 8 or equivalent compressor oil.
2.INSTALL COOLER COMPRESSOR ASSEMBLY
for LHD:
Install the cooler compressor assembly with the 4 bolts. Tighten the bolts in the order shown in the illustration.
Connect the connector.
for RHD:
Install the cooler compressor assembly with the 4 bolts. Tighten the bolts in the order shown in the illustration.
Connect the connector.
3.INSTALL NO. 1 COOLER REFRIGERANT DISCHARGE HOSE
for LHD:
Remove the vinyl tape attached to the No. 1 cooler refrigerant discharge hose.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the compressor.
ND-OIL 8 or equivalent
Install the O-ring to the No. 1 cooler refrigerant discharge hose.
Connect the No. 1 cooler refrigerant discharge hose with the bolt.
for RHD:
Remove the vinyl tape attached to the No. 1 cooler refrigerant discharge hose.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the compressor.
ND-OIL 8 or equivalent
Install the O-ring to the No. 1 cooler refrigerant discharge hose.
Connect the No. 1 cooler refrigerant discharge hose with the bolt.
4.INSTALL SUCTION HOSE SUB-ASSEMBLY
for LHD:
Remove the vinyl tape attached to the suction hose sub-assembly.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the compressor.
ND-OIL 8 or equivalent
Install the O-ring to the suction hose sub-assembly.
Connect the suction hose sub-assembly with the bolt.
for RHD:
Remove the vinyl tape attached to the suction hose sub-assembly.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the compressor.
ND-OIL 8 or equivalent
Install the O-ring to the suction hose sub-assembly.
Connect the suction hose sub-assembly with the bolt.
5.INSTALL FAN AND GENERATOR V BELT
6.CHARGE REFRIGERANT
7.WARM UP ENGINE
8.CHECK FOR REFRIGERANT GAS LEAK