1.INSTALL INTEGRATION PANEL SUB-ASSEMBLY
Connect the No. 1 cooler wire to the integration panel sub-assembly (air conditioning panel) as shown in the illustration.
Attach the 3 claws to the lower heater control base.
Install the 4 screws.
Install the 4 screws.
2.INSTALL CENTER INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY
3.INSTALL CENTER LOWER INSTRUMENT CLUSTER FINISH PANEL