INSPECTION
Inspection · Vehicles built from Aug 2013
| INSPECT OIL PRESSURE SWITCHING VALVE ASSEMBLY |
Measure the resistance according to the value(s) in the table below.
- Standard Resistance:
Tester Connection
Condition
Specified Condition
1 - 2
20°C (68°F)
13 to 17 Ω
Connect the positive (+) lead of the battery to terminal 1 and the negative (-) lead to terminal 2 and check that the operating sound of the oil pressure switching valve can be head.

- NOTICE:
- These tests must be performed within 10 seconds to prevent the coil from burning out.
- Always turn the voltage on and off on the battery side, not the oil pressure switching valve side.
- These tests must be performed within 10 seconds to prevent the coil from burning out.
