2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL WATER PUMP ASSEMBLY
  1. Install a new gasket and the water pump with the 8 bolts.

    Torque:
    9.0 N*m{ 91 kgf*cm , 79 in.*lbf }


2. INSTALL TIMING CHAIN COVER SUB-ASSEMBLY

  1. A222350E01
    Install 3 new O-rings to the timing chain cover as shown in the illustration.
    Text in Illustration 
    *1
    New Water Pump O-ring
    *2
    New Water Pump Upper O-ring
    *3
    New Oil Pump O-ring

  1. A101362E02
    Align the drive rotor spline of the oil pump and crankshaft timing gear as shown in the illustration.
    Text in Illustration 
    *1
    Drive Rotor Spline
    *2
    Crankshaft Timing Gear

  1. Apply seal packing to the timing chain cover in a continuous line as shown in the following illustration.

    A222357E01

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent


    Application Specification:
    Area
    Seal Packing Diameter
    Distance from Edge of Cover to Center of Seal Packing
    Seal Packing Application Length
    Protrusion from Cylinder Head
    A - A
    (Dashed line)
    2.5 to 4.0 mm (0.0984 to 0.157 in.)
    2.0 mm (0.0787 in.)
    -
    -
    B - B
    (Continuous line)
    10 to 14 mm (0.394 to 0.551 in.) wide and 2.5 to 4.0 mm (0.0984 to 0.157 in.) thick
    6.0 mm (0.236 in.)
    46 mm (1.81 in.) from top of bolt hole
    -
    C - C
    (Continuous line)
    10 to 14 mm (0.394 to 0.551 in.) wide and 2.5 to 4.0 mm (0.0984 to 0.157 in.) thick
    6.0 mm (0.236 in.)
    54 mm (2.13 in.) from top of bolt hole
    -
    D - D
    (Continuous line)
    9.0 to 13 mm (0.354 to 0.512 in.) wide and 2.5 to 4.0 mm (0.0984 to 0.157 in.) thick
    -
    13 mm (0.512 in.) from top of bolt hole
    -
    E - E
    (Continuous line)
    9.0 to 13 mm (0.354 to 0.512 in.) wide and 2.5 to 4.0 mm (0.0984 to 0.157 in.) thick
    -
    13 mm (0.512 in.) from top of bolt hole
    -
    I - I
    (Continuous line)
    8.0 mm (0.315 in.)
    -
    56.5 mm (2.22 in.) from bottom of cylinder head
    2.0 to 3.0 mm (0.0787 to 0.118 in.)
    J
    10 mm (0.394 in.)
    -
    20 mm (0.787 in.)
    -

    Text in Illustration 
    *1
    Cylinder Head
    *2
    Cylinder Block
    *3
    Seal Packing
    *4
    Seal Packing Thickness
    *5
    Seal Packing Width
    *6
    Protrusion

    NOTICE:
    1. Remove any oil from the contact surface.
    2. When the contact surfaces are wet, wipe them with an oil-free cloth before applying seal packing.
    3. Install the timing chain cover within 3 minutes and tighten the bolts within 15 minutes after applying seal packing.
    4. Do not start the engine for at least 4 hours after the installation.

  1. Temporarily install the timing chain cover with the 19 bolts and 2 nuts.

    A101363E03

    Bolt Length:
    Item
    Length
    Thread Diameter
    Bolt A
    75 mm (2.95 in.)
    10 mm (0.394 in.)
    Bolt B
    75 mm (2.95 in.)
    8 mm (0.315 in.)
    Bolt C
    90 mm (3.54 in.)
    8 mm (0.315 in.)
    Bolt D
    95 mm (3.74 in.)
    8 mm (0.315 in.)
    Bolt E
    35 mm (1.38 in.)
    8 mm (0.315 in.)
    Bolt F
    75 mm (2.95 in.)
    10 mm (0.394 in.)

  1. Excluding the bolts labeled A and F, tighten the bolts and nuts in this order: Area 1, Area 3, Area 2.

    Torque:
    for bolt C:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }
    for bolt B, D and nut:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }

    Text in Illustration 
    *1
    Area 1
    *2
    Area 2
    *3
    Area 3
    *4
    Area 4
    *5
    Nut
    -
    -

  1. Tighten the bolts labeled A in this order: Area 2 and Area 3.

    Torque:
    60 N*m{ 612 kgf*cm , 44 ft.*lbf }

  1. Tighten the bolts labeled F.

    Torque:
    46 N*m{ 469 kgf*cm , 34 ft.*lbf }

  1. Tighten the bolts labeled E in Area 4.

    Torque:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }


3. INSTALL V-RIBBED BELT TENSIONER ASSEMBLY

  1. G035081E05
    Temporarily install the belt tensioner with the 3 bolts.

    HINT:
    Make sure that the flanges of the bolts are contacting the tensioner surface.

  1. Install the tensioner by tightening the 3 bolts in the order shown in the illustration.

    Torque:
    for bolt 1:
    40 N*m{ 408 kgf*cm , 30 ft.*lbf }
    for bolt 2:
    21 N*m{ 214 kgf*cm , 15 ft.*lbf }
    for bolt 3:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }


4. INSTALL OIL PAN SUB-ASSEMBLY
  1. Install a new O-ring.

  1. A222361E01
    Apply seal packing in a continuous line as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Application Specification:
    Area
    Seal Packing Diameter
    Distance from Edge of Cover or Center of Bolt Hole to Center of Seal Packing
    A - A
    2.0 to 3.0 mm (0.0787 to 0.118 in.)
    8.0 mm (0.315 in.)
    B - B
    2.0 to 3.0 mm (0.0787 to 0.118 in.)
    6.5 mm (0.256 in.)

    Text in Illustration 
    *1
    Seal Packing

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the oil pan within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 4 hours after the installation.

  1. A273964E02
    Temporarily install the oil pan with the 16 bolts and 2 nuts.

    Bolt Length:
    Item
    Length
    Bolt A
    20 mm (0.787 in.)
    Bolt B
    40 mm (1.57 in.)

    Text in Illustration 
    V100135
    Bolt A
    V100136
    Bolt B
    V100137
    Nut

  1. Uniformly tighten the 16 bolts and 2 nuts in the order shown in the illustration.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }


5. INSTALL OIL STRAINER SUB-ASSEMBLY
  1. Install a new gasket and the oil strainer with the bolt and 2 nuts.

    Torque:
    26 N*m{ 265 kgf*cm , 19 ft.*lbf }


6. INSTALL NO. 2 OIL PAN SUB-ASSEMBLY

  1. A101343E03
    Apply seal packing in a continuous line as shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal packing diameter:
    3.0 to 4.0 mm (0.118 to 0.157 in.)

    Text in Illustration 
    *1
    Seal Packing

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the oil pan within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 4 hours after the installation.

  1. A101291E03
    Temporarily install the oil pan with the 20 bolts and 2 nuts.
    Text in Illustration 
    V100135
    Bolt
    V100136
    Nut

  1. Uniformly tighten the 20 bolts and 2 nuts in the order shown in the illustration.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Install a new gasket and the drain plug.

    Torque:
    38 N*m{ 382 kgf*cm , 28 ft.*lbf }


7. INSTALL TIMING CHAIN COVER OIL SEAL

  1. A170255E01
    Apply MP grease to the lip of a new oil seal.

    NOTICE:
    1. Do not allow foreign matter to contact the lip of the oil seal.
    2. Do not allow MP grease to contact the dust seal.

  1. Temporarily install the oil seal to the timing chain cover.

  1. Using SST and a hammer, tap in the oil seal until its surface is flush with the chain cover edge.

    SST
    09223-75010  
    09950-70010   (09951-07100)

    NOTICE:
    1. Keep the lip free from foreign matter.
    2. Do not tap the oil seal at an angle.


8. INSTALL CRANKSHAFT PULLEY

  1. G037341E02
    Align the key groove of the pulley with the pulley set key and slide on the pulley.

  1. Using SST, install a new crankshaft pulley bolt.

    SST
    09213-54015   (91651-60855)
    09330-00021  

    Torque:
    260 N*m{ 2651 kgf*cm , 192 ft.*lbf }

    Text in Illustration 
    *a
    Hold
    V100135
    Turn

    NOTICE:
    Do not reuse the pulley bolt.


9. INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY

  1. A101368E02
    Install 2 new cover gaskets to the head cover.

  1. Apply seal packing to the places shown in the illustration.

    Seal packing:
    Toyota Genuine Seal Packing Black, Three Bond 1207B or equivalent

    Seal packing diameter:
    4.0 mm (0.157 in.)

    Text in Illustration 
    V100135
    Seal Packing

    NOTICE:
    1. Remove any oil from the contact surface.
    2. Install the head cover within 3 minutes after applying seal packing.
    3. Do not start the engine for at least 4 hours after the installation.

  1. A101292E02
    Temporarily install the head cover with the 19 bolts and 2 nuts.

  1. Uniformly tighten the 19 bolts and 2 nuts in the order shown in the illustration.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. In numerical order, confirm that the bolts labeled 1 to 8 are tightened to the specified torque. Tighten the bolts as necessary.


10. INSTALL NO. 1 WATER BY-PASS PIPE
  1. Install a new gasket and the water by-pass pipe with the 2 nuts and bolt.

    Torque:
    18 N*m{ 178 kgf*cm , 13 ft.*lbf }


11. INSTALL CRANKSHAFT POSITION SENSOR

  1. G037915E03
    Apply a light coat of engine oil to the O-ring of the crankshaft position sensor.
    Text in Illustration 
    *1
    O-Ring

  1. Install the crankshaft position sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

    NOTICE:
    Make sure that the O-ring is not cracked or jammed when installing.

  1. Connect the crankshaft position sensor connector and attach the wire harness clamp.


12. INSTALL CAMSHAFT POSITION SENSOR

  1. G037911E03
    Apply a light coat of engine oil to the O-ring of the camshaft position sensor.
    Text in Illustration 
    *1
    O-Ring

  1. Install the camshaft position sensor with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

    NOTICE:
    Make sure that the O-ring is not cracked or jammed when installing.

  1. Connect the camshaft position sensor connector.


13. INSTALL NO. 1 IDLER PULLEY SUB-ASSEMBLY
  1. Install the spacer and idler pulley with the bolt.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }


14. INSTALL THERMOSTAT

A223319E01
  1. Install a new gasket to the thermostat.

  1. Install the thermostat with the jiggle valve upward.

    HINT:
    The jiggle valve may be set within 10° to either side of the prescribed position.


15. INSTALL WATER INLET
  1. Install a new gasket and water inlet with the 2 nuts and bolt.

    Torque:
    28 N*m{ 286 kgf*cm , 21 ft.*lbf }


16. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET

NOTICE:
Install the No. 1 compressor mounting bracket exactly as described in the procedures below to properly secure and prevent damage to the fan and generator V belt.

  1. A330624
    Temporarily install the No. 1 compressor mounting bracket with the 3 bolts.

    HINT:
    Temporarily install the No . 1 compressor mounting bracket with the 3 bolts so that the bracket can be moved by hand.

  1. A332227E01
    Push the No. 1 compressor mounting bracket toward the cylinder block as shown in the illustration and tighten bolt B.

    Torque:
    for bolt B:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }

    Text in Illustration 
    *a
    No Clearance
    *b
    Push
    *c
    Front

    HINT:
    Make sure there is no clearance between the cylinder block and No. 1 compressor mounting bracket as shown in the illustration.

  1. A332228E01
    Uniformly tighten the 4 bolts in the order shown in the illustration.

    Torque:
    for bolt A:
    45 N*m{ 459 kgf*cm , 33 ft.*lbf }
    for bolt C:
    25 N*m{ 250 kgf*cm , 18 ft.*lbf }

    Text in Illustration 
    V100135
    Bolt A
    V100136
    Bolt C


17. INSTALL GENERATOR ASSEMBLY
  1. Install the generator with the 2 bolts.

    Torque:
    43 N*m{ 438 kgf*cm , 32 ft.*lbf }

  1. Connect the generator connector.

  1. Install the generator wire with the nut.

    Torque:
    9.8 N*m{ 100 kgf*cm , 87 in.*lbf }

  1. Install the terminal cap.


18. INSTALL INTAKE MANIFOLD
  1. Install the intake manifold (Click here).


19. INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY

  1. A102440E02
    Install a new gasket to the intake manifold.
    Text in Illustration 
    *1
    Protrusion
    *2
    Groove

    HINT:
    Align the protrusion of the gasket with the groove of the intake manifold.

  1. for Type A:
    Install the throttle body with motor with the 2 bolts and 2 nuts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. for Type B:
    Install the throttle body with motor with the 4 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the water by-pass hose.

  1. Connect the No. 2 water by-pass hose.

  1. Connect the throttle position sensor and throttle control motor connector.


20. INSTALL IGNITION COIL ASSEMBLY
  1. Install the 4 ignition coils with the 4 bolts.

    Torque:
    9.0 N*m{ 92 kgf*cm , 80 in.*lbf }

  1. Connect the 4 ignition coil connectors.


21. INSTALL ENGINE ASSEMBLY
  1. Install the engine to the vehicle (Click here).

← INSTALLATION (Aug 2013 – Jul 2014)PRECAUTION (from Aug 2013) →