2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

REMOVAL

Removal / installation · Vehicles built Aug 2013 – Jul 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

NOTICE:
  1. After turning the ignition switch off, waiting time may be required before disconnecting the cable from the battery terminal. Therefore, make sure to read the disconnecting the cable from the battery terminal notice before proceeding with work (Click here).
  2. When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).


2. REMOVE DIESEL THROTTLE BODY
  1. Remove the diesel throttle body (Click here).


3. REMOVE INJECTION PIPE SET

  1. A121940E03
    Using a union nut wrench, loosen the 8 union nuts of the 4 injection pipes.
    Text in Illustration 
    *1
    Union Nut Wrench
    *a
    for Injection Nozzle Side
    *b
    for Injection Pump Side

  1. Remove the 2 nuts, 2 upper pipe clamps and 4 injection pipes with 2 lower pipe clamps.


4. REMOVE NO. 1 GLOW PLUG CONNECTOR

  1. A224317
    Remove the nut, No. 2 glow plug resistor insulator and washer and disconnect the wire harness.

  1. Remove the 4 screw grommets and 4 nuts.

  1. Remove the No. 1 glow plug connector and No. 1 glow plug resistor insulator.


5. REMOVE NOZZLE LEAKAGE PIPE ASSEMBLY

  1. A121941
    Disconnect the fuel hose from the leakage pipe.

  1. Remove the 4 nuts, leakage pipe and 4 ring packing washers.


6. REMOVE NOZZLE HOLDER AND NOZZLE SET

  1. A121942E01
    Using SST, remove the 4 injection nozzles, 4 injection nozzle seats and 4 injection nozzle seat gaskets.
    SST
    09268-64010   (09268-64020)

← COMPONENTS (from Aug 2013)REMOVAL (from Aug 2014) →