2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built from Aug 2013


1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY

  1. A093611E12
    Install a new O-ring to the oil control valve.
    Text in Illustration 
    *1
    New O-Ring

  1. Apply a light coat of engine oil to the O-ring.

  1. Install the camshaft timing oil control valve with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Connect the camshaft timing oil control valve connector.

  1. Install the wiring harness clamp bracket with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }

  1. Attach the 2 clamps and connect the 2 connectors.

← INSPECTION (from Aug 2013)COMPONENTS (from Aug 2013) →