INSTALLATION
Removal / installation · Vehicles built from Aug 2013
| 1. INSTALL DIESEL THROTTLE BODY |
Place a new gasket and the diesel throttle body on the intake manifold.
Connect the throttle control motor connector.
Connect the throttle open switch connector.
| 2. INSTALL INTAKE FLANGE |
Install a new gasket and the intake flange with the 3 nuts.
- Torque:
- 12 N*m{ 122 kgf*cm , 9 ft.*lbf }
Connect the PCV hose.
Connect the manifold absolute pressure sensor connector.
Connect the heater water hose with the bolt.
- Torque:
- 14 N*m{ 138 kgf*cm , 10 ft.*lbf }
| 3. INSTALL INTAKE PIPE |
Install the intake pipe with the 2 bolts and tighten the hose clamp.
- Torque:
- for bolt:
- 18 N*m{ 184 kgf*cm , 13 ft.*lbf }
- for clamp:
- 6.0 N*m{ 61 kgf*cm , 53 in.*lbf }
| 4. INSTALL RESONATOR WITH AIR CLEANER CAP SUB-ASSEMBLY |
Insert the hinge part of the air cleaner cap and hose into the air cleaner case, and then attach the 4 hook clamps.
Connect the air cleaner cap sub-assembly with the clamp.
- Torque:
- 5.0 N*m{ 51 kgf*cm , 44 in.*lbf }
Attach the wire harness clamp.
Connect the 2 clamps and connector.
