2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built from Aug 2013


1. INSTALL DIESEL THROTTLE BODY ASSEMBLY
  1. Install a new gasket and the diesel throttle body with the 2 bolts and 2 nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the throttle control motor connector.


2. INSTALL NO. 1 INTAKE PIPE
  1. Connect the No. 1 intake pipe with the No. 1 air hose and install the 2 bolts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Tighten the 2 hose clamps of the No. 1 air hose.

    Torque:
    6.5 N*m{ 66 kgf*cm , 58 in.*lbf }

  1. Connect the 2 connectors to the intake air temperature sensor and throttle position sensor.

  1. Attach the 2 wire harness clamps.


3. CONNECT INTERCOOLER AIR HOSE

  1. A239591E01
    Connect the intercooler air hose and tighten the hose clamp.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

    Text in Illustration 
    *a
    Front Side of Vehicle
    *b
    RH Side

    HINT:
    Install the hose clamp so that it is facing the direction shown in the illustration.


4. CONNECT NO. 4 VACUUM TRANSMITTING PIPE SUB-ASSEMBLY
  1. Connect the No. 4 vacuum transmitting pipe with the bolt.

    Torque:
    8.0 N*m{ 82 kgf*cm , 71 in.*lbf }


5. INSTALL NO. 1 ENGINE COVER SUB-ASSEMBLY

  1. A239588E01
    Attach the 2 No. 1 engine cover hooks to the No. 3 engine cover bracket.
    Text in Illustration 
    *1
    No. 1 Engine Cover Hook
    *2
    No. 3 Engine Cover Bracket

  1. Install the 2 nuts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

← REMOVAL (from Aug 2013)COMPONENTS (from Aug 2013) →