2013-2015 Land Cruiser Prado · Service Manual Power Source / Network

REASSEMBLY

Removal / installation · Vehicles built from Aug 2014

Versions by build date: Aug 2013 – Jul 2014 from Aug 2014


1. INSTALL GENERATOR ROTOR ASSEMBLY
  1. Install the generator rotor to the generator drive end frame.

    NOTICE:
    Do not drop the generator rotor assembly.

  1. Install the washer to the generator rotor.

  1. A220304E01
    Using a 17 mm socket wrench and press, slowly press on the rectifier end frame.
    Text in Illustration 
    *1
    17 mm Socket Wrench

  1. Install the 4 nuts.

    Torque:
    4.5 N*m{ 46 kgf*cm , 40 in.*lbf }

  1. Install the 3 terminal insulators to the rectifier end frame.


2. INSTALL GENERATOR HOLDER WITH RECTIFIER
  1. Install the generator holder with rectifier with the 3 screws.

    Torque:
    2.0 N*m{ 20 kgf*cm , 17 in.*lbf }


3. INSTALL GENERATOR REGULATOR ASSEMBLY
  1. Install the generator regulator with the 2 screws.

    Torque:
    2.0 N*m{ 20 kgf*cm , 17 in.*lbf }


4. INSTALL GENERATOR BRUSH HOLDER ASSEMBLY
  1. Install the plate seal.

  1. Install the generator brush holder with the 3 screws.

    Torque:
    2.0 N*m{ 20 kgf*cm , 17 in.*lbf }

  1. Install the brush cover to the generator brush holder.

  1. Install the terminal insulator with the nut.

    Torque:
    4.1 N*m{ 42 kgf*cm , 36 in.*lbf }

  1. Install the generator rear end cover with the 2 nuts.

    Torque:
    4.4 N*m{ 45 kgf*cm , 39 in.*lbf }

  1. Install the rectifier plate with the nut and screw.

    Torque:
    for nut:
    4.4 N*m{ 45 kgf*cm , 39 in.*lbf }
    for screw:
    3.9 N*m{ 39 kgf*cm , 34 in.*lbf }


5. INSTALL GENERATOR WITH CLUTCH PULLEY
  1. Temporarily install the generator with clutch pulley to the generator rotor shaft by hand.

  1. Mount the generator in a vise between aluminum plates.

  1. A219545E01
    Install SST (A) and SST (B) to the generator with clutch pulley as shown in the illustration.
    SST
    09820-63021  
    Text in Illustration 
    *1
    Rotor Shaft

    NOTICE:
    Securely attach SST to the generator with clutch pulley and generator rotor shaft.

  1. A219547E03
    Using a wrench to hold SST (A), turn SST (B) clockwise to tighten the generator with clutch pulley.

    Torque:
    Specified tightening torque:
    80 N*m{ 816 kgf*cm , 59 ft.*lbf }

    Text in Illustration 
    *a
    Hold
    *b
    Torque Wrench Fulcrum Length
    V100135
    Turn

    NOTICE:
    Be careful as the generator with clutch pulley or generator rotor shaft may be damaged if the position of SST is not securely maintained while performing this operation.

    HINT:
    1. Calculate the torque wrench reading when changing the fulcrum length of the torque wrench (Click here).
    2. When using SST (fulcrum length of 100 mm (3.9 in.)) + torque wrench (fulcrum length of 400 mm (15.7 in.)):
      64 N*m (653 kgf*cm, 47 ft.*lbf)

  1. Remove SST from the generator.

  1. Check that the generator with clutch pulley rotates smoothly.


6. INSTALL GENERATOR PULLEY CAP
  1. Install a new generator pulley cap to the generator with clutch pulley.

← REASSEMBLY (Aug 2013 – Jul 2014)INSTALLATION (Aug 2013 – Jul 2014) →