2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSTALLATION

Removal / installation · Vehicles built from Aug 2013


1. INSTALL AIR SWITCHING VALVE ASSEMBLY
  1. Set the No. 1 exhaust manifold heat insulator in place.

  1. Install the air switching valve with 2 new nuts.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Connect the connector.

  1. w/ Manifold Absolute Pressure Sensor:
    Connect the vacuum hose.


2. INSTALL NO. 4 INTAKE PIPE

  1. A223926E01
    Install 2 new gaskets and the No. 4 intake pipe with 4 new nuts in the order shown in the illustration. Tighten the nuts labeled 1 and 3 to the torque specification again.

    Torque:
    20 N*m{ 204 kgf*cm , 15 ft.*lbf }

  1. Check that the nuts are tightened to the torque specification.


3. INSTALL NO. 1 EXHAUST MANIFOLD HEAT INSULATOR
  1. Install the No. 1 exhaust manifold heat insulator with the 5 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }


4. CONNECT NO. 1 AIR INJECTION SYSTEM HOSE

  1. A225248E01
    Connect the No. 1 air injection system hose so that its paint mark aligns with the rib of the air switching valve as shown in the illustration.
    Text in Illustration 
    *1
    Rib
    *2
    Paint Mark
    *a
    Upper
    *b
    RH Side

    HINT:
    1. Make sure the paint mark of the No. 1 air injection system hose is facing upward.
    2. Make sure the direction of the hose clamp is as shown in the illustration.


5. INSTALL FRONT NO. 1 FENDER APRON TO FRAME SEAL RH
  1. Install the front No. 1 fender apron to frame seal with the 5 clips.


6. INSTALL AIR CLEANER CASE
  1. Install the air cleaner case with the 3 bolts.

    Torque:
    12 N*m{ 122 kgf*cm , 9 ft.*lbf }

  1. Install the air cleaner filter element.


7. INSTALL AIR CLEANER AND HOSE

  1. A230208E01
    Install the air cleaner hose, align its matchmark with the matchmark of the air cleaner cap as shown in the illustration.
    Text in Illustration 
    *1
    Matchmark
    *a
    Upper Side
    *b
    Front

  1. Tighten the hose clamp.

    Torque:
    5.0 N*m{ 51 kgf*cm , 44 in.*lbf }

  1. Attach the 4 clamps.

  1. Install the ground wire and clamp with the bolt.

    Torque:
    8.5 N*m{ 87 kgf*cm , 75 in.*lbf }

  1. Connect the mass air flow meter connector and attach the 3 clamps.

← INSPECTION (from Aug 2013)COMPONENTS (from Aug 2013) →