2013-2015 Land Cruiser Prado · Service Manual Engine / Hybrid System

INSPECTION

Inspection · Vehicles built from Aug 2013


INSPECT AIR SWITCHING VALVE ASSEMBLY
  1. Measure the resistance according to the value(s) in the table below.

    Standard Resistance:
    Tester Connection
    Condition
    Specified Condition
    1 - 2
    20°C (68°F)
    4.5 to 5.5 Ω
    1 - Body ground
    Always
    1 MΩ or higher
    2 - Body ground

    HINT:
    When measuring the resistance make sure that the surface temperature of the air switching valve is 20°C.

    If the result is not as specified, replace the air switching valve assembly.

  1. Check the operation of the air switching valve.

    1. A099565E04
      Check that air does not flow from port A to port B.
      Text in Illustration 
      *1
      Port A
      *2
      Port B
      V100135
      Air

      NOTICE:
      Make sure the applied pressure is 30 kPa (0.3 kgf/cm2, 4.4 psi) or less.

      If the result is not as specified, replace the air switching valve assembly.

    2. A227190E01
      Apply battery voltage across terminals 1 and 2.
      Text in Illustration 
      *1
      Port A
      *2
      Port B
      V100135
      Air

      NOTICE:
      Apply voltage for 2 minutes or less.

    3. Check that air flows from port A to port B.
      If the result is not as specified, replace the air switching valve assembly.

← REMOVAL (from Aug 2013)INSTALLATION (from Aug 2013) →